My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 13 - SB One Way to Two Way Conversion Division B Proj No 116-001B - Rieth-Riley Construction Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 13 - SB One Way to Two Way Conversion Division B Proj No 116-001B - Rieth-Riley Construction Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:54:36 PM
Creation date
5/24/2017 1:26:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 43 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No, 116-001 <br />Add 306 LFT to Line Item No. 332 LINE, THERMOPLASTIC, SOLID, YELLOW, 4" @ <br />$0.45/LFT for a total addition of $137.70. <br />Add 62 LFT to Line Item No. 335 LINE, THERMOPLASTIC, SOLID, WHITE, 6" @ <br />$1.50/LFT for a total addition of $93.00. <br />Add 226 LFT to Line Item No. 340 LINE, MULTI -COMPONENT, SOLID, WHITE, 4" @ <br />$0.65/LFT for a total addition of $146.90. <br />Add 326 LFT to Line Item No. 343 LINE, MULTI -COMPONENT, SOLID, WHITE, 6" @ <br />$1.50/LFT for a total addition of $489.00. <br />Add 23 LFT to Line Item No. 349 TRANSVERSE MARKING, THERMOPLASTIC, <br />STOP LINE, 24" @ $5.00/LFT for a total addition of $115,00. <br />Add 3 EACH to Line Item No. 357 PAVEMENT MESSAGE MARKING, <br />THERMOPLASTIC, LANE INDICATION ARROW @ $80.00/EACH for a total addition <br />of $240.00. <br />Add 1 EACH to Line Item No. 358 PAVEMENT MESSAGE MARKING, <br />THERMOPLASTIC, ONLY @ $90.00/EACH for a total addition of $90.00. <br />Add 1 EACH to Line Item No. 359 PAVEMENT MESSAGE MARKING, <br />THERMOPLASTIC, HANDICAP SYMBOL @ $250.00/EACH for a total addition of <br />$250, 00. <br />Add 5 EACH from Line Item No. 360 PAVEMENT MESSAGE MARKING, MULTI - <br />COMPONENT, LANE INDICATION ARROW @ $200.001EACH for a total change <br />Of $1,000.00. <br />Add 7 EACH from Line Item No. 476 PAVEMENT MESSAGE MARKING, REMOVE @ <br />$82.50/EACH for a total change of $577.50, <br />SPECIFICATIONS: <br />No change required. <br />DRAWINGS: <br />The following sheets have been revised or issued as new sheets. <br />Division B Part 1 of 3 Revision 19 <br />Sheets 17, 218 — Deleted Sheet <br />Sheet 17-A — Replaced Sheet; Extended Line "COL" Alignment <br />Sheet 218-A — Replaced Sheet; Added Eastbound Left Turn Lane @ Lafayette Blvd <br />Sheet 200-A, 210, 217 -- Revised Markings & Parking Spots <br />END OF CHANGE ORDER NO. 36 <br />Sheet 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.