My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 13 - SB One Way to Two Way Conversion Division B Proj No 116-001B - Rieth-Riley Construction Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 13 - SB One Way to Two Way Conversion Division B Proj No 116-001B - Rieth-Riley Construction Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:54:36 PM
Creation date
5/24/2017 1:26:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 43 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: American Structurepoint, Inc. <br />C. Ryan Huebschman, P.E., PTOE <br />Professional Engineer No. 11400171 <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Conversion Division B <br />Project No. 116-001 <br />SUBJECT: Pavement Markings Adjustments - Various Locations <br />ISSUE DATE: April 17, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. Revise pavement markings to add parking spaces north of the intersection of <br />Michigan Street and Sample Street <br />2. Add lane indication arrows west of the intersection of Western Avenue and St. <br />Joseph Street. <br />3. Add pavement markings along Colfax Avenue west of Lafayette Blvd. <br />4. Realign markings for thru lane and bike lane on Colfax Avenue east of St. Joseph <br />Street. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONT&ALT REQUIREMENTS: <br />I. Bid/Proposal Form: <br />Division B: <br />Add 1,047 LFT to Line Item No. 328 LINE, REMOVE @ $0.101LFT for a total addition <br />of $104,70, <br />Add 1 EACH to Line Item No. 330 PAVEMENT MESSAGE MARKING, MULTI - <br />COMPONENT, BIKE SYMBOL @ $300.00/EACH for a total addition of $300.00. <br />Add 208 LFT to Line Item No. 331 LINE, THERMOPLASTIC, SOLID, WHITE, 4" @ <br />$1.451LFT for a total addition of $301.60. <br />Sheet 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.