Laserfiche WebLink
Change Order No. 25 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />Add 1 LSM to Line Item No. EWA 485 MAIN STREET DETOUR AT BRONSON PER <br />PLANS @ $3,407.00/LSM for a total change of $ 3,407.00, <br />Add 1 LSM to Line Item No. EWA 486 CONCRETE REMOVAL & PREP FOR <br />ATTENUATOR PLACEMANT @ $8,064.001LSM for a total addition of $8,064.00. <br />Add 2 EACH to Line Item No. EWA 487 IMPACT ATTENUATOR, R2 W1-LS, TL-1 @ <br />$15,865.00/EACH for a total addition of $31,730.00. <br />SPECIFICATIONS: <br />No Changes <br />DRAWINGS: <br />The following sheets have been revised or issued as new sheets. <br />Division B Part 1 of 3 Revision 20 <br />Sheets 47-1 & 47-2 — Added Sheets for Maintenance of Traffic Plan <br />Sheet 48-B — Deleted Sheet <br />Sheet 48-C — Replaced Sheet; Removed Median & Outside Guardrail, Shifted Attenuators <br />Sheet 231 — Revised Remarks for Structure No. 93 & 97 <br />END OF CHANGE ORDER NO.25 <br />Sheet 2 of 3 <br />