My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 13 - SB One Way to Two Way Conversion Division B Proj No 116-001B - Rieth-Riley Construction Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 13 - SB One Way to Two Way Conversion Division B Proj No 116-001B - Rieth-Riley Construction Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:54:36 PM
Creation date
5/24/2017 1:26:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 25 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: Lochmueller Group <br />Myron Cohagan <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Conversion Division B <br />Project No. 116-001 <br />SUBJECT: Guardrail Removal and Impact Attenuators at CSX RR Bridge along Main Street <br />ISSUE DATE: April21, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. Remove Guardrail in Median and Exterior Lane Along Main Street between <br />Bronson and South Streets at CSX Railroad <br />2. Install stand-alone Impact Attenuator on each end of median pier to protect the <br />CSX RR Bridge Pier <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />RIDDING AND CONTRACT REQUIREMENTS: <br />1. Bid/Proposal Form: <br />Division B: <br />Subtract 2 EACH from Line Item No. 80 GUARDRAIL ENDTREATMENT, MS @ <br />$4,700.001EACH for a total change of—($9,400.00). <br />Subtract 2 EACH from Line Item No. 439 GUARDRAIL END TREATMENT, OS @ <br />$2,675.00/EACH for a total change of-($5,350.00). <br />Subtract 4 EACH from Line Item No. 440 CURVED TERMINAL END @ $50.001EACH <br />for a total change of-($200.00). <br />Subtract 939 LFT from Line Item No. 441 GUARDRAIL, W-BEAM, 6'-3" SPACING @ <br />$18.301LFT for a total change of-($17,183.70). <br />Sheet 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.