My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Calvert Street Lift Station Replacement Proj No 116-053 - HRP Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 1 - Calvert Street Lift Station Replacement Proj No 116-053 - HRP Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:35:40 PM
Creation date
5/24/2017 1:23:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAGE 1 of 1 Pages <br />MICHIANA CONTRACTING INC <br />7843 LILAC ROAD <br />PO BOX 929 <br />PROPOSAL <br />o PLYMOUTH IN 46563 <br />��4'4C1��ta PHONE:574-936-6613 FAX:674-936.6201 <br />TO: HRP <br />Phone :ff2116/2017 <br />574-271-7800 <br />JOB NUMBER! LOCATION <br />Cakvert Street Lift Station <br />colt E-mait <br />Prspared by RJL <br />ljoes@htpcgggmcfton.com <br />Deduct- for not installing wood pole for service. <br />This includes: Rental and fuel <br />$100.00 <br />Labor <br />$129.00 <br />Wood pole/Meterbase <br />$361.00 Total Deduct <br />($590,00) <br />Deduct- for not installing 1 114" conduit 96A. <br />This Includes: Rental and fuel <br />$85.00 <br />Labor <br />$504.00 <br />Conduit/string <br />$90.00 Total Deduct <br />($679.00) <br />(140ft 1 114" pvc $0,41perft.,2-1 114" elbows,4-coup,4-1 114" coup,10ft i 114r' pvc coated rd. string line) <br />Adder -for installing H frame service per RFI##10 and AEP requirments, <br />This includes installing AEP Meter, CT equimpent, Stainless CT cabinet, <br />2-4" conduits and pull strings per AEP, 5" conduit <br />for light and antenna mass. <br />This Includes: Rental and Fuel <br />$500.00 <br />Labor <br />$3,100.00 <br />Material <br />$5,800.00 Total Adder <br />$9,400.00 <br />Deduct -for not installing spare 4" conduit for AEP <br />$650.00 <br />($650.00) <br />(140ft 4" pvc $3,45per ft., 2-4 pvc elbow,4-4" pvc coup,24'strap,l Oft -4"pvc coated rd,string line) <br />Total adder to contract <br />$7,481.00 <br />Payment to be made as follows: <br />Upon receipt of progressive billing -Net 30 days <br />I malarial is guaranteed to be as specified, All wads to he mrnplolad inn professional <br />mennerace( ding 10 standard practices. Any alwatun or devialon from above <br />spacirrcafts invahraig extra costswill he execuled only open written orders, and vn1l <br />Authorized <br />became an extra charge over and above the estimate. Ag agreements contingent upon <br />Signature f�l.Q/Yt r a.0 9'i•¢.Q//12G7iQ/1 <br />shikos, accideals, or delays beyond ourconlrel, owner to carry rare, lomado, and <br />Randy J. Longaneckevr <br />aver necessary insurance. Out weftrs are Mly covered by Worker's Compeneagon <br />Note: This Proposal may be withdrawn <br />Inslr ..Ge <br />by us If not accepted in 30 days <br />Acceptance of Proposal: The above prices, <br />specifications and conditlons are satisfactory and are <br />hereby accepted. You are authorized to do the work <br />Signature <br />as specified. Payment will be mods as outlined above. <br />Signature <br />Date of Adceptance: <br />
The URL can be used to link to this page
Your browser does not support the video tag.