My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - WWTP Belt Filter Press #4 Rehabilitation Proj No 117-025 - Industrial Maintenance & Contract Services L.P.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - WWTP Belt Filter Press #4 Rehabilitation Proj No 117-025 - Industrial Maintenance & Contract Services L.P.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 12:24:58 PM
Creation date
4/13/2017 9:23:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wastewater Treatment Plant Belt Filter Press #4 Rehabilitation <br />Project No. 117-025 <br />Daily safety meetings will be held before any employee starts work. The hazards of each task <br />will be reviewed and each employee will be made cognizant of the dangers involved in the <br />upcoming work. IMCLP maintains records of employees' safety training, safety meetings <br />(attendance sheet, items discussed along with the corresponding sections of the IMCLP and <br />client safety manuals), and safety contacts. <br />Quality Control <br />Orders for materials are written to meet the project specifications. Upon delivery, the material is <br />signed for and shipping receipts are sent to the main office and checked against the ordered <br />material to verify that it meets the specification. <br />Inspections <br />A three-tier inspection system will be in place during the project. It includes a punch -out <br />inspection, pre -final inspection, and final acceptance inspection. At the final acceptance <br />inspection, IMCLP representatives (general foreman and quality control manager) will be in <br />attendance with the client or client representative. <br />Project Closeout <br />IMCLP will submit any remaining project documents as required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.