Laserfiche WebLink
B. Engineer's services under the Study and Report Phase will be considered complete on the date <br />when the revised Report and any other deliverables have been delivered to Owner. <br />A 1.02 Preliminary Design Phase — 30% and 50% <br />A. Concurrently with the preparation of the draft Traffic Study Report, and upon written authorization <br />from Owner, Engineer shall: <br />1. Provide necessary field and topographic surveys for design purposes including the following <br />(For survey limits, See Exhibits A.I. and A.2.): <br />a. Establish horizontal and vertical control throughout the project limits. Horizontal control <br />will be based on Indiana State Plane Coordinates, East Zone, NAD83. Vertical control <br />will be based on NAVD88. <br />b. Request the marking of the underground utilities through the Indiana 811 service <br />c. Provide approximately 1,300 lineal feet of topographic mapping within the limits indicated <br />in Exhibits A.1. and A.2. The width of the survey corridor will be the apparent right-of- <br />way. The mapping will include features such as curbs, sidewalks, traffic poles, <br />underground utility markings and etc. The height of overhang features such as canopies <br />and traffic signals will be an additional service. The detailing of ADA access points, if <br />required, will be an additional service. <br />d. Locate and provide rim elevations for located castings (manholes, catch basins and curb <br />inlets) within the project limits, including those just beyond the curb line. <br />e. Detail sanitary and storm structures to determine invert elevations, type and size of pipes. <br />f. Create topographic base map from the survey data. <br />g. Include approximate property and right-of-way lines based on City GIS, recorded <br />subdivision plats, and found evidence. <br />2. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and written descriptions of the Project, including (See <br />Exhibit A.1.): <br />a. Develop Preliminary Design and Plans for the two-way conversion of Colfax Avenue from <br />W. Lasalle Avenue (Sommers Court) to LaPorte Avenue, the two-way conversion of W. <br />Lasalle Avenue (Sommers Court) from Colfax Avenue to LaPorte Avenue, the realignment <br />for the intersection of Colfax Avenue with W. Lasalle Avenue (Sommers Court) including <br />drainage modifications and the addition of the Cemetery Visitor Parking Lot, sidewalk <br />replacement, as required, along Elm Street from Washington Street to and including the <br />intersection of Colfax Avenue with Elm Street, and the removal and replacement of street <br />trees in the tree lawn on both sides of Elm Street from Washington Street to Colfax <br />Avenue. <br />Page 3 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />