My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:57:43 AM
Creation date
1/3/2017 3:04:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2) Twyckenham Drive <br />3) Oak Ridge Drive <br />4) Terrace <br />5) Harrington Drive <br />6) Rosemary Lane <br />7) Crestwood Blvd <br />8) Woodfield Drive <br />9) Brummit Lane <br />10) Beutter Lane <br />11) Browne Lane <br />12) Helmen Drive <br />13) Ebeling Drive <br />3. Utility mapping will be based upon information obtained from utility owners. <br />4. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />5. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various cost <br />categories which comprise Total Project Costs. <br />6. Perform or provide the following additional Preliminary Design Phase tasks or deliverables <br />for the identified project limits. The project limits along Edison Road from the East side of <br />Duey Street to 300 feet West of Hickory Road for a total corridor length of approximately <br />9,100 feet. The project limits along Ironwood Road from Mishawaka Avenue to McKinley <br />Avenue for a total corridor length of approximately 5,500 feet. The total length of the project <br />will be 14,600 feet: <br />a. Design rehabilitation of existing roadway to consist of 1.5-inch mill & resurface <br />b. Identify locations for full depth patching <br />c. Design full depth pavement repair on Ironwood Road, north of Lincolnway. <br />1) Repair to include concrete panel replacement and traffic loop replacement. <br />ENGINEER will identify the limits of pavement repair in coordination with the <br />OWNER. <br />d. Design reconstruction of existing curb ramps <br />e. Design pavement markings along corridors <br />f. Design Signalized intersection improvements including: <br />1) FLIR camera installation at the following intersections: <br />a) Ironwood Road and McKinley Ave. <br />b) Ironwood Road and Jefferson Blvd. <br />c) Angela Blvd. and Twyckenham Drive <br />d) Edison Road and Crestwood Blvd. <br />2) Replacement of existing traffic controller/cabinet at the following intersections: <br />a) Ironwood Road and Jefferson Blvd. <br />b) Edison Road and Crestwood Blvd. <br />3) Design pedestrian signal components at the following intersection: <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.