My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Award - Wastewater Treatment Plant Digester Gas Utilization Design Proj No 116-050R - Thieneman Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Award Bids
>
Bid Award - Wastewater Treatment Plant Digester Gas Utilization Design Proj No 116-050R - Thieneman Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:28:16 PM
Creation date
1/3/2017 2:19:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. All time limits for Milestones, if any, Substantial Completion and completion and <br />readiness for final payment as stated in the Contract Documents are of the essence <br />of the Contract. <br />4.02 Days to Achieve Substantial Completion and Final Payment <br />A. The Work will be substantially completed within 300 consecutive calendar days <br />after the date when the Contract Times commence to run as provided in paragraph <br />2.03 of the General Conditions, and completed and ready for final payment in <br />accordance with paragraph 14.07 of the General Conditions within 330 <br />consecutive calendar days after the date when the Contract Times commence to <br />run. <br />B. Milestone 1 — All submittals will be submitted to ENGINEER within 90 <br />consecutive calendar days of Notice -to -Proceed. Select shop drawings are to be <br />submitted earlier in accordance with Specification Section 0133 00. <br />C. It is expressly understood and agreed, by and between the CONTRACTOR and <br />OWNER, that the Contract Time for completion of the work described herein is a <br />reasonable time, taking into consideration the average climatic and economic <br />conditions and other factors prevailing in the locality of the work and excludes the <br />time for unavoidable delays which were beyond the control and without the fault <br />of the CONTRACTOR. <br />4.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this <br />Agreement and that OWNER will suffer financial loss if the Work is not <br />completed within the times specified in paragraphs 4.02A. and 4.02B. above plus <br />any extensions thereof allowed in accordance with Article 12 of the General <br />Conditions. They also recognize the delays, expense and difficulties involved in <br />proving in a legal or arbitration proceeding the actual loss suffered by OWNER if <br />the Work is not completed on time. Accordingly, instead of requiring any such <br />proof, OWNER and CONTRACTOR agree that as liquidated damages for delay <br />(but not as a penalty) CONTRACTOR shall pay OWNER one -thousand dollars <br />($1,000) for each day that expires after the time specified in paragraphs 4.02A. and <br />4.02B. for Substantial Completion until the Work is substantially complete. After <br />Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to <br />complete the remaining Work within the Contract Time or any proper extension <br />thereof granted by OWNER, CONTRACTOR shall pay OWNER five hundred <br />dollars ($500) for each day that expires after the time specified in paragraph <br />4.02A. for completion and readiness for final payment until the Work is completed <br />and ready for final payment. <br />SB W WTP Digester Gas Utilization Design <br />Project No. 116-050 R 00 52 00-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.