Laserfiche WebLink
SECTION 00 52 00 <br />FORM OF AGREEMENT BETWEEN <br />OWNER AND CONTRACTOR <br />THIS AGREEMENT is dated as of the 22nd day of December in the <br />year 2016 by and between the City of South Bend, Indiana (hereinafter called OWNER) <br />and Thieneman Construction, Inc. (hereinafter call CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />Article 1. WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />Furnish all labor, materials, equipment, supplies and services for the installation of <br />gas piping, valves, pressure vessels, tanks, modifications to existing PLC, system <br />integration, connections to existing fuel gas fired engines, concrete, earthwork, <br />selective demolition, and all other associated work to furnish and install a complete <br />and functioning gas distribution system. <br />Article 2. THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole <br />or only a part is generally described as follows: <br />W WTP Digester Gas Utilization Design <br />Project 116-050 R <br />Article 3. ENGINEER <br />3.01 The Project has been designed by Greeley and Hansen who is hereinafter called <br />ENGINEER and who is to act as OWNER's representative, assume all duties and <br />responsibilities and have the rights and authority assigned to ENGINEER in the <br />Contract Documents in connection with the completion of the Work in accordance <br />with the Contract Documents. <br />Article 4. CONTRACT TIMES <br />4.01 Time of the Essence <br />SB W WTP Digester Gas Utilization Design <br />Project No. 116-050 R 00 52 00-1 <br />