My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - Greeley and Hansen - Digester Gas Utilization Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
Amendment to PSA - Greeley and Hansen - Digester Gas Utilization Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 11:59:02 AM
Creation date
1/3/2017 2:14:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agreement for Professional Engineering Services between City of South Bend, Indiana and <br />Greeley and Hansen <br />January 2016 - Revised November 2016 (Contract Amendment No, 2) <br />4. CONSTRUCTION OFFICE SERVICES <br />4A Submittal Review: Review up to 30 shop drawings and/or product submittals for compliance with the design <br />concept as expressed in the Contract Documents. Invoice the costs associated with review of third and <br />subsequent submittals separately from the other tasks. Costs associated with review of third or subsequent <br />submittals are not included in the compensation set forth in this Agreement for Professional Engineering Services <br />and are to be compensated for as additional services. <br />Deliverables: <br />Deliverables with this task include a letter of transmittal, with review remarks, to the Contractor for each submittal <br />with a copy issued to the City. <br />4.2 Progress Meetings: Attend monthly progress meetings (up to 8) during the duration of the project. Project <br />Manager and PF9jeot Eginee to attend progress meetings. <br />Deliverables: <br />Dpliverables for this task inolude meeting agendas PFOVided one day on adVaRGe of the meeting to the <br />City Project Manager—m Meeting agendas and meeting notes will be provided by the Contractor. <br />4.3 General Administration: Respond to inquiries from the Contractor and the City relative to interpretation of the <br />drawings and specifications, and other matters concerning construction. Project scope is based upon providing <br />responses for up to twenty (20) Contractor requests for information (RFIs). <br />Deliverables: <br />Deliverables with this task include responses to RFIs. <br />4.4 Supplementary Drawings and Claim Review: Review up to five (5) proposed contractor claims and provide <br />recommendations for disposition. Prepare up to three (3) supplementary drawings and specifications as needed <br />for clarification of the Contract Documents. Design changes are excluded from the scope of this task and will be <br />provided under separate authorization by the City. <br />Deliverables: <br />Deliverables with this task include up to three (3) supplementary drawings and/or specifications and up to three <br />(3) requests for proposals to be submitted to the Contractor to obtain cost for changes and/or work change <br />directives to describe changes to the Contractor. Deliverables also include final change order documentation. <br />A-5 r,� GREELEYAW.HANSEN <br />
The URL can be used to link to this page
Your browser does not support the video tag.