My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - Greeley and Hansen - Digester Gas Utilization Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
Amendment to PSA - Greeley and Hansen - Digester Gas Utilization Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 11:59:02 AM
Creation date
1/3/2017 2:14:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agreement for Professional Engineering Services between City of South Bend, Indiana and <br />Greeley and Hansen <br />January 2016 - Revised November 2016 (Contract Amendment No. 2) <br />I. Quality Control: Perform a quality control review of the design at the 50% and 90% design levels, addressing <br />conformance with applicable regulations, standards and codes, constructability, and biddability. Quality <br />control review comments will be addressed in the design drawings. <br />Deliverables: <br />There are no deliverables associated with this task. <br />3. BID ASSISTANCE <br />3.1 Bidder Inquires and Addenda: Respond to bidders' inquiries during the bidding period. Prepare addenda to <br />clarify the Contract Documents as necessary. <br />Deliverables: <br />Deliverables with this task include addenda addressing contract document updates, as needed. <br />3.2 Pre -Bid Meeting: Project Manager and Project Engineer will attend and conduct one (1) pre -bid meeting and <br />prepare meeting notes. <br />Deliverables: <br />Deliverables with this task include a meeting agenda provided one day in advance of the meeting to the City <br />Project Manager and meeting notes to be provided to the City Project Manager within 10 working days of the pre - <br />bid meeting. <br />3.3 Re -Bid Pre -Bid Meeting: Project Manager will attend and conduct one (1) pre -bid meeting and prepare <br />meeting notes. <br />Deliverables: <br />Deliverables with this task include a meeting agenda provided one day in advance of the meeting to the <br />City Project Manager and meeting notes to be provided to the City Project Manager within 10 working <br />days of the pre -bid meeting. <br />3.4 Re -Bid Bidder Inquires and Addenda: Respond to bidders' inquiries during the bidding period. Prepare <br />addenda to clarify the Contract Documents as necessary. <br />Deliverables: <br />Deliverables with this task include addenda addressing contract document updates, as needed. <br />A-4 .^"P�+- GREELEVAmo HANSEN <br />
The URL can be used to link to this page
Your browser does not support the video tag.