Laserfiche WebLink
Project No. 116-001 <br />CITY OF SOUTH BEND <br />Change Order No. 30 - <br />1013196 <br />PROJECT NAME: One -Way to Two -Way Street Conversion —Division B <br />PROJECT NUMBER: 116-001 <br />Division B: <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />83 <br />SIDEWALK, CONCRETE, 5" <br />-319 <br />SYS <br />$37.00 <br />($-11,803.00) <br />116 <br />BRICK, DECORATIVE <br />-741 <br />SYS <br />$113.00 <br />($-83,733.00) <br />117 <br />BRICK, DECORATIVE, PERMEABLE <br />-412 <br />SYS <br />$61.00 <br />($-25,132.00) <br />118 <br />OVERSTORY TREE, 2", CALIPER <br />2 <br />EACH <br />$408.00 <br />$816.00 <br />121 <br />SHRUB, NO. 3 CONTAINER <br />-2 <br />EACH <br />$40.50 <br />(-$81.00) <br />122 <br />PERENNIAL, NO. 1 CONTAINER <br />-1 <br />EACH <br />$14.50 <br />($-14.50) <br />331 <br />LINE, THERMOPLASTIC, SOLID, WHITE, 4IN. <br />667 <br />LFT <br />$1.45 <br />$967.15 <br />478 <br />STAMPED AND STAINED PAVER BAND <br />1477 <br />LFT <br />$7.50 <br />$11,077.50 <br />479 1 <br />PAVER BAND <br />1,005 <br />SYS <br />$230.00 <br />$2311150.00 <br />OWNER: City of South Bend <br />Signature <br />Date <br />$123,247.15 <br />CONTRACTOR: Rieth-Riley Construction <br />S'1'gnature <br />Date <br />ill 3ol1G <br />