Laserfiche WebLink
Change Order No. 30 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />Add 667 LFT to Line Item 331: LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN., 667 LFT @ <br />$1.45/LFT for a total addition of $967.15 <br />Add 1477 LF to Line Item 478: STAMPED and STAINED PAVER BAND through <br />APPROACHES, 1477 LFT @ $7.50/SYS for a total addition of $ 11,077.50 <br />Add 1,005 SYS to Line Item EWA: PAVER BAND, CYCLE TRACK 1,005 SYS @ $230.00/SYS <br />for a total addition of $ 231,150.00 <br />SPECIFICATIONS: <br />NO CHANGE REQUIRED <br />DRAWINGS: <br />The following sheets have been revised and are issued as new sheets as a part of this Change Order: <br />Sheet 2 — Revision Note No. 15 Added <br />Sheets 7, 8, 10 through 13, 50 through 52, 55 through 58, 69 through 72, 73-A, 74, 81 <br />through 83, 84-A, 85 — Revised Legend to Incorporate Revised Paver Band <br />Sheets 86 — Revised Details to Add Stamped Concrete Across Drives in Place of <br />Paver Band. <br />Sheets 136-A, 138-A, 139, 198, 199 - Deleted Sheets <br />Sheets 138-B, 138-B - Added Sheets to Modify Median Planting Details. <br />Sheets 139-A - Added Sheets to Modify Paver Band Details. <br />Sheets 198-A, 199-A - Added Sheets to Modify Pavement Marking & Signing Details. <br />END OF CHANGE ORDER NO. 30 <br />Sheet 2 of 3 <br />