My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 10 - SB One Way to Two Way Conversion Proj No 116-001B - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 10 - SB One Way to Two Way Conversion Proj No 116-001B - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:49:57 PM
Creation date
12/14/2016 3:15:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mat'] Delivery <br />Description <br />Hourly Cost <br />Hours <br />Total <br />Straight Time Rates <br />Foreman <br />$ 99.00 x <br />16 <br />= $ <br />1,584.00 <br />Laborer <br />$ 57.00 x <br />32 <br />= $ <br />1,824.00 <br />Operator <br />$ 87.50 x <br />16 <br />= $ <br />1,400.00 <br />Teamster <br />$ 53.00 x <br />16 <br />_ $ <br />848.00 <br />Over Time Rates <br />Hourly Cost <br />Hours <br />Total <br />Foreman <br />$ 123.00 x <br />1 <br />_ $ <br />123.00 <br />Laborer <br />$ 75.00 x <br />1 <br />_ $ <br />75.00 <br />Operator <br />$ 112.00 x <br />1 <br />_ $ <br />112.00 <br />Teamster <br />$ 69.50 x <br />2 <br />= $ <br />139.00 <br />Equipment <br />Hourly Cost <br />Hours <br />Total <br />Tool Truck <br />$ 15.00 x <br />= $ <br />Cat 325 <br />$ 104.00 x <br />= $ <br />Cat 330 <br />$ 123.00 x <br />16 <br />= $ <br />1,968.00 <br />Cat 345 <br />$ 180.00 x <br />= $ <br />_ <br />RT-Volvo <br />$ 81.00 x <br />= $ <br />Cat 416 <br />$ 34.00 x <br />= $ <br />Volvo Loader <br />$ 77.00 x <br />= $ <br />JD 650 Dozer <br />$ 65.00 x <br />= $ <br />40' Flat <br />$ 60.00 x <br />18 <br />= $ <br />1,080.00 <br />Material <br />Price <br />Quantity <br />Total (+ 12% Mark up) <br />x <br />= $ <br />x <br />= $ <br />x <br />= $ <br />x <br />= $ <br />x <br />= $ <br />x <br />= $ <br />x <br />= $ <br />TOTAL COST ======> <br />Description of Work Completed: Cost to load unused structures & deliver to <br />Foreman Signature: <br />Inspector Signature: <br />$ 9,153.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.