My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 10 - SB One Way to Two Way Conversion Proj No 116-001B - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 10 - SB One Way to Two Way Conversion Proj No 116-001B - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:49:57 PM
Creation date
12/14/2016 3:15:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project No. 116-001 <br />Change Order No. 32 - <br />06/10/16 <br /><SovYk&F <br />O 1:, <br />CITY OF SOUTH BEND <br />PROJECT NAME: One -Way to Two -Way Street Conversion — Division B 186i <br />PROJECT NUMBER: 116-001 <br />Division B: <br />Item <br />No. <br />Description <br />Quantity <br />UEUnit <br />Total Amount <br />473 <br />Structure 164 Modification <br />I <br />L <br />$17 385.97 <br />474 <br />Furnish and deliver leftover Structures <br />1 <br />L <br />$31,157.37 <br />475 <br />Time and material for Structure Modifications <br />1 <br />L <br />$13,939.49 <br />$62,482.80 <br />OWNER: City of South Bend CONTRACTOR: Rieth-Riley Construction <br />_ 4 — <br />Signature 4ignatu�re- <br />1113011 J� <br />Date Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.