Laserfiche WebLink
Project No. 116-001 <br />Change Order No. 32 - <br />06/10/16 <br /><SovYk&F <br />O 1:, <br />CITY OF SOUTH BEND <br />PROJECT NAME: One -Way to Two -Way Street Conversion — Division B 186i <br />PROJECT NUMBER: 116-001 <br />Division B: <br />Item <br />No. <br />Description <br />Quantity <br />UEUnit <br />Total Amount <br />473 <br />Structure 164 Modification <br />I <br />L <br />$17 385.97 <br />474 <br />Furnish and deliver leftover Structures <br />1 <br />L <br />$31,157.37 <br />475 <br />Time and material for Structure Modifications <br />1 <br />L <br />$13,939.49 <br />$62,482.80 <br />OWNER: City of South Bend CONTRACTOR: Rieth-Riley Construction <br />_ 4 — <br />Signature 4ignatu�re- <br />1113011 J� <br />Date Date <br />