Laserfiche WebLink
Change Order No. 32 <br />One- Way to Two -Way Street Conversion <br />Division B — Part 1 <br />Project No. 116-001 <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQ IREMENTS• <br />1. Bid/Proposal Form: <br />Division B: <br />ADD 1 LSM Structure 164 Modification Line Item 473: 1 LSM @ $17,385.97 for a total addition <br />of $17,385.97 <br />ADD 1 LSM Furnish and Deliver leftover structures Line Item 474: 1 LSM $31,157.37 for a total <br />addition of $31,157.37 <br />ADD 1 LSM Time and Material for structure Modifications Line 475 1 LSM $13,939,49 for a total <br />addition of $13,939.49 <br />NO CHANGE REQUIRED <br />DRAWINGS: <br />NO CHANGES REQUIRED <br />END OF CHANGE ORDER NO. x <br />Sheet 2 of 3 <br />