My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 10 - SB One Way to Two Way Conversion Proj No 116-001B - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 10 - SB One Way to Two Way Conversion Proj No 116-001B - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:49:57 PM
Creation date
12/14/2016 3:15:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 32 <br />One- Way to Two -Way Street Conversion <br />Division B — Part 1 <br />Project No. 116-001 <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQ IREMENTS• <br />1. Bid/Proposal Form: <br />Division B: <br />ADD 1 LSM Structure 164 Modification Line Item 473: 1 LSM @ $17,385.97 for a total addition <br />of $17,385.97 <br />ADD 1 LSM Furnish and Deliver leftover structures Line Item 474: 1 LSM $31,157.37 for a total <br />addition of $31,157.37 <br />ADD 1 LSM Time and Material for structure Modifications Line 475 1 LSM $13,939,49 for a total <br />addition of $13,939.49 <br />NO CHANGE REQUIRED <br />DRAWINGS: <br />NO CHANGES REQUIRED <br />END OF CHANGE ORDER NO. x <br />Sheet 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.