My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Calvert Street Lift Station Replacement Proj No 116-053 - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Award Bids
>
Award Bid - Calvert Street Lift Station Replacement Proj No 116-053 - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:17:04 PM
Creation date
12/14/2016 2:45:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,DLZ I INNOVATIVE IDEAS Calvert Street Lift Station Replacement <br />EXCEPTIONAL DESIGN Bid Recommendation <br />ARCHITECTURE• SHE I NEER ING. oLANNI NO UNMATCHED CLIENT SERVICE Page 2of2 <br />SURVEYING •CONSTRUCTION SERVICES <br />4) Neither the Good Faith Efforts Form (MWBE-2.0) or the Contacted Form (MWBE-2.1) was <br />included in the bid packet for Rieth-Riley Construction. <br />DLZ recommends that the Board's legal counsel and engineering department review all of the bids. <br />Upon concurrence by the Board's legal and engineering staff with DLZ's findings, DLZ recommends <br />that the City of South Bend award HRP Construction the Calvert Street Lift Station Replacement <br />project for a contract amount of $917,000.00. <br />Should you have any questions, please do not hesitate to contact me at your earliest convenience. <br />Sincerely, <br />0:-�q /��T <br />AnthonyJ. Kenning, P.E. <br />Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.