My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Calvert Street Lift Station Replacement Proj No 116-053 - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Award Bids
>
Award Bid - Calvert Street Lift Station Replacement Proj No 116-053 - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:17:04 PM
Creation date
12/14/2016 2:45:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'DLZ <br />/.lacarno, ORF.FNOIXlFRIXO•RFANMINO <br />SURV FYINO• CONST in"'ON SFRvICFS <br />December 9, 2016 <br />Mr. Jacob Klosinski, P.E. <br />Assistant City Engineer <br />Environmental Services <br />City of South Bend <br />3113 Riverside Drive <br />South Bend, IN 46628 <br />INNOVATIVE IDEAS <br />EXCEPTIONAL DESIGN <br />UNMATCHED CLIENT SERVICE <br />RE: Calvert Street Lift Station Replacement (Project No. 116-053) <br />Bid Recommendation <br />Dear Mr. Klosinski: <br />On December 8, 2016, seven (7) bids were received and publicly opened by the City of South Bend <br />Board of Public Works (Board) for the Calvert Street Lift Station Replacement Project. DLZ reviewed <br />the submitted documents and offers the following analysis and recommendation: <br />1) A certified bid tabulation is attached and indicates that HRP Construction is the lowest, most <br />responsive, and responsible bidder for this project. HRP acknowledged all addenda and <br />provided all required documentation to be submitted with their bid. Their bid amount is <br />$917,000.00 which is below the Engineer's estimate. <br />2) The bid for Haskins Underground was either missing the following items or had <br />mathematical issues: <br />a. The MBE/WBE Participation Form (MWBE-1.0) was not in the bid packet; <br />b. The wrong bid form was utilized; and <br />c. The correct total amount for bid item #16 was not provided. <br />Items and c' as listed above would not affect the conclusion that HRP provided the <br />lowest bid for the project. <br />3) Grand River Construction did not calculate their base bid total properly. Adding up the <br />individual bid items, their total bid would be $1,247,014.00. This does not affect the <br />conclusion that HRP provided the lowest bid for the project. <br />2211 E Jefferson Blvd, South Bend, IN 46615-2692 I OFFICE 574.236 4400 I ONLINE WWW.DLZ.COM <br />Akron Burns Harbor Chicago Cincinnati Cleveland Columbus Detroit Pon Wayne Frankfort Indianapolis Joliet Kalamazoo Lansing Louisville Madison <br />Melvindale Munster Pittsburgh Saint Joseph Somh Bentl Toledo <br />
The URL can be used to link to this page
Your browser does not support the video tag.