Laserfiche WebLink
REGULAR MEETING NOVEM13ER22 2016 367 <br />APPROVE CHANGE ORDER NO. 9 — SOUTH BEND ONE-WAY TO TWO-WAY <br />CONVERSION DIVISION B — PROJECT NO. H 6-001 (TIF BOND) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 9 on behalf <br />of Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, Indiana, indicating the <br />intermediate completion date be moved to November 23, 2016 to allow for additional work to be <br />done while the weather holds out. Mr. Villa noted the time is not being added to the contract <br />final completion date, rather Rieth-Riley will make adjustments to their schedule. Upon a motion <br />made by Ms. Doran, seconded by Ms. Fritzberg and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO 2 (FINAL) AND PROJECT COMPi ETION AFFIDAVIT <br />p—2016 YARD LAMPPOST PROGRAM —PROJECT NO.116-003(LOSS RECOVERY) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 2 (Final) on <br />behalf of Martell Electric, LLC, 4601 Cleveland Road, South Bend, Indiana indicating the <br />contract amount be decreased by $1,000 for a new contract sum, including this Change Order, of <br />$20,250,00. Additionally submitted was the Project Completion Affidavit indicating this new <br />final cost of $20,250.00. Upon a motion made by Ms. Doran. seconded by Ms. Fritzberg and <br />carried, Change Order No. 2 (Final) and the Project Completion Affidavit were approved. <br />^•++ rrrcn. �1H L1UN NQ. 7 HVAC — <br />PROJECTNO 116-067 (FIRE DEPARTMENT CAPITAL IMPROVEMENT <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Ideal Consolidated, Inc., 806 W. Sample Street, South Bend, Indiana, for <br />the above referenced project, indicating a final cost of $11,760.00. Upon a motion made by M <br />Doran, seconded by Ms. Fritzberg and carried, the Project Completion Affidavit was approved.s. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — IGNITION PARK IDENTITY <br />SIGNAGE—PROJECTN0.115-103 WDATIF <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Poblocki Sign Co., LLC, 922 S. 7VI Street, Milwaukee, Wisconsin, for the <br />above referenced project, indicating a final cost of $141,437.00. Upon a motion made by Ms. <br />Dorau, seconded by Ms. Fritzberg and carried, the Project Completion Affidavit was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT CENTURY CENTER ELECTRICAL <br />DISTRIBUTION UPGRADES — PROJECT NO. 116-007 (HOTELMIO"I'EL TAX) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Days Corporation, 55169 CR 3 North, Elkhart, Indiana, for the above <br />referenced project, indicating a final cost of $89,877.08. Upon a motion made by Ms. Dorau, <br />seconded by Ms. Fritzberg and carried, the Project Completion Affidavit was approved <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE <br />SHEET— JMS BUILDING FACADE WORK PROJECT NO 116-048 (RWDA TIF) <br />In a memorandum to the Board, Mr. Richard Estes, Engineering, requested permission to <br />advertise for the receipt of bids for the above referenced project. Also presented at this time for <br />approval and execution was the Title Sheet. Upon a motion made by Ms. Duran, seconded by <br />Ms. Fritzberg and carried, the above request to advertise was approved, and the Title Sheet was <br />approved and signed. <br />APPROVAL OF REQUEST T'O ADVERTISE FOR THE RECEIPT OF BIDS — ONE (1) OR <br />MORE 2016 OR NEWER ONE 1 TON. TWO 2 WHEEL DRIVE DUMP TRUCK <br />WATER WORKS CAPITAL) <br />In a memorandum to the Board, Mr. Jeff Hudak, Central Services, requested permission to <br />advertise for the receipt of bids for the above referenced vehicle. Upon a motion made by Ms. <br />Doran, seconded by Ms. Fritzberg and carried, the above request to advertise was approved. <br />In a memorandum to the ➢oard, Mr. Richard Estes, Engineering, requested permission to <br />advertise for the receipt of bids for the above referenced project. Also presented at this time for <br />approval and execution was the Title Sheet. Upon a motion made by Ms. Doran, seconded by <br />Ms. Fritzberg and carried, the above request to advertise was approved, and the Title Sheet was <br />approved and signed. <br />