My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Perley Primary Center Safe Routes to School Construction Inspection Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Perley Primary Center Safe Routes to School Construction Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:57:35 AM
Creation date
11/9/2016 1:59:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX "C" <br />Schedule: <br />No work under this Contract shall be performed by the CONSULTANT until the CONSULTANT receives a <br />written notice -to -proceed from the LOCAL PUBLIC AGENCY. <br />All work by the CONSULTANT under this Agreement shall be completed and delivered to the LOCAL PUBLIC <br />AGENCY for review and approval, if required, within the following time periods, exclusive of review time by <br />the LOCAL PUBLIC AGENCY and INDOT. <br />A. Construction Engineering <br />1. April 2017 — November 2017 <br />B. Final Construction Records <br />1. Within 45 days from Final Acceptance <br />Page 1 of 1 Appendix "C" <br />
The URL can be used to link to this page
Your browser does not support the video tag.