My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Perley Primary Center Safe Routes to School Construction Inspection Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Perley Primary Center Safe Routes to School Construction Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:57:35 AM
Creation date
11/9/2016 1:59:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX "B" <br />Information and Services to be furnished by the LOCAL PUBLIC AGENCY: <br />The LOCAL PUBLIC AGENCY shall furnish the CONSULTANT with the following: <br />A. Construction Documents <br />B. All written views pertinent to the project that are received by the LOCAL PUBLIC AGENCY. <br />C. Guarantee access to enter upon public and private lands as required for the CONSULTANT under <br />this Agreement. <br />D. All legal services as may be required for development of the project. <br />E. LOCAL PUBLIC AGENCY shall designate an employee as Project Coordinator to coordinate <br />activities between the CONSULTANT and the LOCAL PUBLIC AGENCY. <br />F. Assistance to the CONSULTANT by placing at his disposal all available information pertinent to <br />the project. <br />G. LOCAL PUBLIC AGENCY shall provide all necessary advertising fees. <br />H. Fees and insurance required for securing a place for any public hearings. <br />Page Iof I Appendix "B" <br />
The URL can be used to link to this page
Your browser does not support the video tag.