Laserfiche WebLink
REGULAR MEETING September 28, 2015 <br /> <br /> <br /> <br /> <br />WASHINGTON ST. SOUTH BEND IN 46601 AS AN ECONOMIC <br />REVITALIZATION AREA FOR PURPOSES OF A TEN (10) YEAR <br />REAL PROPERTY TAX ABATEMENT FOR A RETAIL PROPERTY <br />LOCATED AT THE TOWER AT WASHINGTON SQUARE <br /> <br />15-91 A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF <br />SOUTH BEND DESIGNATING A CERTAIN AREA WITHIN THE CITY <br />OF SOUTH BEND, INDIANA, COMMONLY KNOWN AS 211 W <br />WASHINGTON ST. SOUTH BEND IN 46601 AS AN ECONOMIC <br />REVITALIZATION AREA FOR PURPOSES OF A TEN (10) YEAR <br />REAL PROPERTY TAX ABATEMENT FOR A PARKING GARAGE <br />LOCATED AT THE TOWER AT WASHINGTON SQUARE <br /> <br /> <br /> <br />Councilmember Gavin Ferlic, Chairperson, Community Investment Committee met this <br />afternoon and did not have a quorum and the Resolutions 15-89, 15-90, 15-91 were sent with no <br />recommendation. <br /> <br />th <br />Presenter: Chris Fielding, Department of Community Investment, Offices on the 14 floor – <br />Before you represent three (3) of four (4) potential tax abatements negotiated on the project. The <br />building is going to be subdivided into four marketable sections: the resident, the hotel, the <br />parking garage, and the commercial space. The subplot process has already begun. The curb tax <br />can never be applied to the hotel section of the building between now and the confirming <br />resolution which may be sixty (60) to seventy (70) days. They will finish the replot of the entire <br />structure in the next seven (7) days. At the point prior to the confirming resolution we made sure <br />we have tax code numbers for all four parcels. We will be coming to the next meeting, we have <br />a UUC Resolution to create residential property in the downtown area. That meeting has been <br />scheduled. We do not anticipate any problems. The total project will create eighty-two (82) new <br />jobs, sixty-three (63) in the hotel, twenty (20) in the retail space, and one (1) as park garage <br />attendant with an annual payroll of 2.7 million dollars. We do have multiple exceptions to the <br />local code. On the hotel tax key we are requesting ten (10) year vacant building tax abatement <br />with a modified schedule. Under state code 6-1.1-12.1 modified in July 2015 to allow the <br />Council up to ten (10) years at any schedule agreed upon at the local level. That schedule is a <br />100% for the first two (2) years while they are in construction and ramp up ninety percent (90%) <br />rd <br />for the 3 year, then eighty-five (85%) for the next three (3) years, and sixty percent (60%) for <br />the last three (3) years. That will be the same schedule applied to the standard abatements that <br />will not exceed ten (10) years either, for residential, commercial, and parking garage. We are <br />also proposing in the MOA 36 months instead of the standard 24 months we typically allow for a <br />project to be completed due to the scope of the project. We expect a return on this within the <br />next 60 days. At that time we will have formal tax due numbers. The proposed investment in the <br />property is approximately $33.3 million dollars, total public investment with the abatements <br />which will have a direct correlation to the amount of money they put into the building. The <br />petitioner is here from the Kramer Group to answer any questions about the new construction <br />that you may have. <br /> <br />Petitioner: Robert Kramer, Kramer Design Group 1420 Broadway Detroit, MI– I am here <br />representing the ownership on this property. Kramer Design Group is a firm of architects and <br />nature designers planners. The bulk of our work is adaptive reuse. We recently completed a <br />project of similar scope in downtown Detroit in a loft hotel with luxury houses above with mixed <br />use retail on the ground floor. It did not have a parking component. It opened approximately a <br />year ago to date with great success. Apartments 100% leased and the hotels have been doing <br />well since day one (1). It is typical for our firm to be involved in these mixed-use projects. We <br />do a lot of hotel work nationally as well as residential. We were first awarded this project when <br />it was just the hotel component about six (6) months ago. We observed the parking garage deck <br />was in severe disrepair: two structural issues where the salts ate away at the concrete and <br />supporting steel. A big change in direction there, very quickly we discovered the majority of the <br />facility had reached its useful life. Subsequently our firm has been involved in comprehensive <br />planning exercises for the entire facility. This is a daylight view of key interest when we were <br />studying the property and trying to understand where to put in entrances to the facility we <br />became aware through the excellent work of the City of the streetscapes program, the two-way <br />35 <br /> <br /> <br />