Laserfiche WebLink
REGULAR MEETING SEPTEMBER 13, 2016 285 <br />prices, not to exceed the amount of $52,514.15. Therefore, Ms. Maradik made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Mr. Relos <br />seconded the motion, which carried. <br />AWARD QUOTATION — FELLOWS STREETSCAPF PHASE 1 DIVISION B (TREES)_ <br />PROJECT NO 116-041B (RWDA TUB <br />Ms. Blair Spotts, Engineering, advised the Board that on September 8, 2016, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Spotts recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Fuerbringer Landscaping & Design, Inc., 22530 Brick Rd., South Bend, Indiana 46628, <br />_ in unit prices not to exceed the amount of $47,590.00. Therefore, Ms. Maradik made a motion <br />that the recommendation be accepted and the quotation be awarded as outlined above. Mr. Relos <br />seconded the motion, which carried. <br />AWARD QUOTATION — TRAFFIC FLIR CAMERAS AT CLEVELAND RD. AND <br />AMERITECH DR —PROJECT NO. 115-13113 (TRAFFIC SIGNAL MAINTENANCE) <br />Ms. Blair Spotts, Engineering, advised the Board that on September 6, 2016, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Sports recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Michiana Contracting, Inc., 7843 Lilac Rd., Plymouth, Indiana 46563, in unit prices not <br />to exceed the amount of $40,400.00. Therefore, Mr. Relos made a motion that the <br />recommendationbe accepted and the quotation be awarded as outlined above. Ms. Maradik <br />seconded the motion, which carried. <br />EXTENSION OF BID AWARD — TWO (2), MORE OR LESS 2016 OR NEWER FULL SIZE <br />CARGO VANS --SPEC W (WASTEWATER CAPITAL) <br />Mr. Jeffrey Hudak, Central Services, advised the Board that on May 10, 2016, the above bid was <br />awarded to the lowest responsive and responsible bidder Jordan Motors, Inc., 609 East Jefferson <br />Boulevard, Mishawaka, Indiana 46545, in the amount of $36,890.00 for the base bid and <br />Alternate No. 1. Mr. Hudak stated Waste Water has now requested to purchase an additional van <br />and Jordan Motors has agreed to honor their May bid price. Therefore, Ms. Maradik made a <br />motion that the recommendation be accepted and the bid award be extended as outlined above. <br />Mr. Relos seconded the motion, which carried. <br />APPROVE CHANGE ORDER NO. 1 — LAFAYETTE FALLS SUBDIVISION PAVEMENT — <br />PROJECT NO 115-086 (LRSA) <br />Mr. Gilot advised that Ms. Nadia Correa, Engineering, has submitted Change Order No. 1 on <br />behalf of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, Indiana 46614, indicating the <br />Contract amount be increased by $67,663.20 for a new contract sum, including this Change <br />Order, in the amount of $406,622,20. In a memo to the Board Ms. Correa explained this project <br />is the aftermath of a developer bankruptcy that left the residents of the neighborhood with <br />incomplete infrastructure. She noted the funds were secured pursuant to the developer's bond <br />and bid out. Ms. Correa stated the project had expected cost overruns on HMA pavement from <br />the onset, but the high overruns were unforeseen to the project manager until after the pavement <br />had been completed. Ms. Correa noted the contractor completed the job in three (3) days and by <br />the time the final pavement tickets were input and it showed the project had already mn over <br />35.5%, the work was already completed. Upon a motion made by Mr. Relos, seconded by Ms. <br />Maradik and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 1— 2016 CURB AND SIDEWALK CONSTRUCTION — <br />PROJECT NO. 116-029 (MVHI <br />Mr. Gilot advised that Ms. Nadia Correa, Engineering, has submitted Change Order No. 1 on <br />behalf of Premium Concrete, 712 Richmond Street, Elkhart, Indiana 46516, indicating the <br />Contract amount be increased by $46,872.20 for a new contract sum, including this Change <br />Order, in the amount of $406,622.20 and an extension of seven (7) days for a new completion <br />date of October 20, 2016. Upon a motion made by Mr. Relos, seconded or nes. complaradik and <br />carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 3 — EAST BANK SEWER SEPARATION PHASE 5 <br />PROJECT NO 114-062A (SEWER BOND) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 3 on behalf <br />of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, Indiana 46614, indicating the <br />