Laserfiche WebLink
REGULAR MEETING JANUARY 2, 1990 <br />MRS. NINA A. TESKE <br />54830 Pear Road <br />South Bend, Indiana <br />VEHICLE NO. <br />TAG NO. <br />AMOUNT BID <br />8. <br />11832 <br />$ 79.80 <br />11. <br />12150 <br />$ 63.96 <br />15. <br />12302 <br />$ 58.80 <br />16. <br />12308 <br />$ 57.70 <br />17. <br />12323 <br />$ 59.90 <br />20. <br />12506 <br />$ 56.60 <br />Upon a motion made by Ms. Humphreys, seconded by Mrs. DeClercq <br />and carried, the above bids were referred to the Department of <br />Code Enforcement for review and recommendation. <br />OPENING OF BIDS - SLUDGE E UI <br />RENT STORAGE BUILDING (SOUTH BEND <br />BUREAU OF WASTEWATER) AND FILING OF APPLICATION FOR BIDDER <br />QUALIFICATION <br />Mr. Leszczynski advised that this was the date set for receiving <br />and opening of sealed bids for the above referred to project. <br />The Clerk tendered proofs of publication of Notice in the South <br />Bend Tribune and the Tri-County News which were found to be <br />sufficient. <br />Board Attorney Jenny Pitts Manier advised that the bid submitted <br />by Ziolkowski Construction, Inc., 1005 South Lafayette, Box 1106, <br />South Bend, Indiana, was not properly notarized and she therefore <br />recommended that it be rejected. Mrs. DeClercq made a motion <br />that the bid be rejected as non -responsive to bidding <br />requirements. Ms. Humphreys seconded the motion which carried. <br />The following bids were opened and publicly read: <br />HARRY H. VERKLER, CONTRACTOR, INC. <br />645 Wilber Street <br />P.O. Box 3608 <br />South Bend, Indiana 46619 <br />Bid was signed by Mr. Fred H. Lusk, President, Non -Collusion <br />Affidavit was in order and a five per cent (50) Bid Bond <br />was submitted. <br />BID: $263,000.00 <br />L.L. GEANS & SONS, INC. <br />56535 Magnetic Drive <br />Mishawaka, Indiana 46545 <br />Bid was signed by Rocky R. Geans, President, Non -Collusion <br />Affidavit was in order and a five per cent (50) Bid Bond <br />was submitted. <br />BID: $236,859.00 <br />The Bid form noted the following clarifications: <br />1. Sanitary Sewer line is stubbed out 5" <br />beyond building line only. <br />2. Field painting is included for metal building <br />red iron O.H. door, walk doors and sheetrock. <br />No other painting is included. <br />