My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Groundwater Remedy and Quarterly Sampling Plan - Oliver Industrial Park - Hull and Assoc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Groundwater Remedy and Quarterly Sampling Plan - Oliver Industrial Park - Hull and Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:14:09 PM
Creation date
8/30/2016 2:04:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HuH & Associates Inc. <br />Page 10 <br />SUMMARY <br />Innovative Environmental Technologies, Inc. presents this proposal as a "Lump -Sum" amount <br />based on the treatments areas and is proposed to cost $295,015.74. IET estimates that it will <br />take 9 days to implement the remedial design with a 1 day for materials receiving and site set- <br />up. The price present herein is guaranteed regardless of the actual field time required to <br />implement the program described herein. <br />Freundlich Factor(%) <br />A..(Y n <br />Ta ehd Zow <br />Horaon <br />ROUt <br />CuNrYardsl <br />Nlaftmablpt <br />I Total Intervabi <br />Days <br />i both'Ph. <br />I <br />Area Cost S) <br />PRBA <br />5 <br />6290 <br />20-05' <br />25 <br />20 <br />5815 <br />5 <br />25 <br />2 <br />5 <br />518,273.46 <br />515.71 <br />$9136730 <br />F" B <br />5 <br />10048 <br />20<5' <br />25 <br />20 <br />9309 <br />5 <br />40 <br />3 <br />8 <br />512,740.84 <br />S1o96 <br />$101,926.68 <br />PRBC <br />5 <br />16328 <br />20-05' <br />25 <br />20 <br />15119 <br />5 <br />65 <br />4 <br />13 <br />57,824.95 <br />1671 <br />5101,721.75 <br />Total <br />3;6561 <br />130,231 <br />130 _ <br />9.OU <br />26 <br />5295,015.74 <br />9 Days <br />MoWva HandDOmim <br />MobJvsfion and Demobilmiban for Two Crews <br />Aa Patesd Lila.e, s41UC.wa <br />Tsw Complete sere oflnjecrion Log SM rofor Site M1tanegenrnt <br />As -Built InIcfion Maps <br />Data Aimlysis Quart AY-orfls appmpnete <br />C mpintcd Iar ion Report and Feld Summary _, _. .. ....._ <br />AU Commsables: Rmtosdh PelleN:A phalt Pflhh; Coacret etc <br />5 to Restamdon <br />Pm'eLct Health aMSfed Plan <br />The "Lump -Sum" price set -forth assumes that a water supply and a secure storage area for <br />chemicals are available forthe duration of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.