My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Groundwater Remedy and Quarterly Sampling Plan - Oliver Industrial Park - Hull and Assoc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Groundwater Remedy and Quarterly Sampling Plan - Oliver Industrial Park - Hull and Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:14:09 PM
Creation date
8/30/2016 2:04:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HuII & Associates Inc. <br />Page 9 <br />Injection Equipment <br />IET Self -Contained Oxidizer Injection System - consisting of - all stainless steel 316 piping, <br />compressors (175 psi/25 CEM), on -board generator, self-contained safety shower and eye wash <br />stations. The system has a spray -on rubber lined floor and walls, with bermed secondary <br />containment. <br />IET 20' MOBILE INJECTION SYSTEM <br />Injection Feed Tank —Configuration <br />Feed Systems, Safety Systems, Compressed Gas Systems <br />All piping Welded Stainless Steel <br />Floors Coated in Chemical Resistant RinoLinin2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.