My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/1902 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1902
>
04/1902 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:29:30 PM
Creation date
2/13/2020 2:10:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/1/1902
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hearing upon the confirmation of Improvement Resolution Noq 47, 48, and 49 for <br />the grading, graveling and corrstruction,of cement curbing on Niles Avenue, Corby street <br />and St. Peter street, respectively. The Engineer filed the estimated costs as follows: <br />For Niles' Avenue, �4548.72, For Corby street, ' 8033.161 For St Peter street, <br />1822. 26� A rem:nst ranee was filed against all of these improvements. Petitioners and <br />Remonstrators also appeared before the Board and argued the question as to the advisab- <br />ility of making these improvements. The Board find that the benefits, including the <br />benefits to the City, are equal to the estimated cost of the, above improvements in each <br />case. Improvement Resolutions 4748 and 49 are accordingly confirmed. <br />Hearing upon the confirmation of Improvement Resolutions 55, 56 and 57, for the <br />construction -of Pipe sewers upon Dubail and Indiana Avenues and a trunk sewer upon ° <br />Prairie Avenue respectively. The engineer filed the estimat: d costs as follows: l{'or the <br />Dubail Avenue sewer, $ '1841.95 For the Indiana° Avenue sewer, 1861.95 For the <br />Prairie Avenue sewer, $ 14621.34 No remonstrances were filed and no remonstrators <br />appeared against the execution of any of the above improvements. The Board find that <br />the benefits, including; the benefits to* the City are in each case equal to the estimated <br />cost of the improvement. Improvement Resolutions No. 55, 56, and 57 are accordingly <br />confirmed. <br />Hearing upon the confirmation of Improvement Resolutions No. 50, 51, 52, 53 and <br />54 for the improvement of Sibley Avenue,- College street, Rush street, Diamond Avenue, <br />and Witwer Avenue respectively. The Engineer filed the estimated costs as follows: <br />Sibley Avenue, A91209.20, College street, $1074.50, Rush street, $1945.30, Diamond Ave- <br />nue, _$563.80, Witwer Avenue, $207.00, No remonstrances were filed and no remonstrators <br />appeared against any of the above improvements. The Board find that the' benefits, in- <br />cluding the benefits to the City are equal to the estimated cost of the above improve- <br />ments in each individual case. Improvement Resolutions 50 to 54 inclusive are' according- <br />ly confirmed. <br />hearing on the confirmation of Improvement Resolution No. 58 for the construe- <br />tion of a pipe sewer on Cushing street and Rex street. remonstrators appeared and prote- <br />sted against the construction of this sewer and a remonstrance was filed. The Engineer <br />filed the <br />estimated <br />Cost, <br />dj-34. S4 <br />The board <br />find that the benefits, including the <br />benefits <br />to the City <br />are <br />equal to the <br />estimated cost <br />of the improvement. Improvement <br />
The URL can be used to link to this page
Your browser does not support the video tag.