My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
06-14-12 Packet
>
6A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:04:13 AM
Creation date
6/11/2012 1:36:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l0 (1 (Z) <br />Community & Economic Development <br />IKS <br />1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 <br />To: Redevelopment Commission <br />From: David Relos, Economic Development Planner Q)V_ Subject: Professional Services Agreement — Abonmarche Troeger site ROW legal descriptions <br />Date: June 14, 2012 <br />The attached Professional Services Agreement is a proposal from Abonmarche to prepare <br />legal descriptions on two pieces of right of way that are needed for completion of the Niles <br />Avenue sewer separation project. These legal descriptions effect small slivers of the <br />Troeger site, which will be developed into 10 townhomes with river views. <br />The two pieces of right of way are: <br />• At the bend of Niles Ave near Jefferson, an easement is needed to allow an electrical <br />line that connects to the hydropower generator near the start of the East Race. <br />• South of this point, there is excess right of way that could be incorporated into the <br />larger tracts of land that make up the development at this site. <br />This proposal will: <br />• Prepare legal descriptions of both areas. <br />• Prepare right of way vacation application and meeting representation. <br />Costs associated with this proposal are $1,200 for right of way legal description preparation, <br />and $1,950 for the vacation application and meeting representation, for a total of $3,150. <br />Staff requests approval of this Professional Services Agreement in the amount of $3,150. <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.