My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
09-27-11 Packet
>
6B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 1:48:15 PM
Creation date
9/23/2011 11:40:06 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l^ 6 <z0 <br />Community & Economic Development r <br />1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 <br />To: Redevelopment Commission <br />From: David Relos, Economic Development Planner 6311�- <br />Subject: Professional Services Agreement - ADG <br />Century Center: southern & western entry improvements <br />Date: September 27, 2011 <br />In an effort to further enhance the beauty and character of Century Center, the southern <br />entry where patrons enter from the parking lot, and the western main entrance off St. <br />Joseph St, are in need of improvements. Architectural Design Group (ADG) has been very <br />involved with design and construction oversight of many of Century Center's recent <br />improvements, and is familiar with this City asset. <br />The proposal for the south entry is for design work to ultimately arrive at a cost estimate for <br />the work to be completed. Improvements under consideration for this entry point are: <br />parking attendant booth and its concrete island; pedestrian safety dividers; limit vehicle <br />entry points into / out of the parking lot for vehicular and pedestrian safety; new planters, <br />landscaping, lighting, curbs, and entry walkway pavement. Total ADG project design cost <br />for this entry point is $7,000. <br />The proposal for the west entry is for design, construction documentation, and assistance <br />with the bidding and construction phases. Improvements under consideration for this entry <br />point are: removal and installation of new entry doors; entry walkway pavement; lighting; <br />and prep, patch, and paint existing columns and canopy. Total ADG project cost for this <br />entry point is $16,000. <br />Once design features and construction estimates are completed, it is expected project <br />funding will be presented to the Commission for consideration. Funding for this project will <br />be supplemented with $150,000 the Hotel -Motel Tax Board has approved for 2012 for the <br />west entry point improvements. <br />Staff requests approval of these Professional Services Agreements, in a not to exceed <br />amount of $23,000 ($7,000 for the south entry point, and $16,000 for the west entry point). <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.