My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (4)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
07-26-11 Packet
>
6C (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:08:14 PM
Creation date
7/22/2011 2:24:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LF) <br />• • u rn eoura <br />g4ili7i o <br />Community & Economic Development <br />1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 <br />To: Redevelopment Commission <br />From: David Relos, Economic Development Planner ° <br />Subject: Century Center Island Pavilion <br />Island Bridge Professional Services Agreement <br />Island Wall Repair <br />Date: July 26, 2011 <br />In an effort to further enhance the beauty and character of the Century Center island, ADG <br />has been studying a variety of permanent pavilion styles that could be erected to not only <br />provide shelter, but to be an artistic compliment to Century Center's architecture and the <br />surrounding community. <br />Attached are pictures of the island as it is today, and of the final design of the pavilion as it <br />will appear on the island. The projected cost of the pavilion, including installation, is <br />$531,920. This new, permanent pavilion will replace the current, temporary tent on the <br />northern end of the island. <br />Secondly, the original plans for the construction of Century Center included a second <br />pedestrian bridge connecting the island to the building. This bridge would connect to the <br />island in the area of the new pavilion, run above the rapids, and connect to the building in <br />the vicinity of the north east corner of the Grand Hall. The attached proposal from ADG to <br />study design concepts, construction documentation, bidding, and construction oversight for <br />this bridge is in the amount of $22,000. <br />Thirdly is a contract addendum in the amount of $5,500. This addendum is for the design of <br />removable wind screens, located at the corners of the new pavilion, to help block winds if <br />needed, and, because of a drainage issue on the island's eastern wall, a combination <br />surface and sub -grade storm water collection and drainage system. This drainage system <br />is needed to alleviate the drainage of storm water that currently leaks out the wall and is <br />causing settlement of the pavement above, and is projected to cost no more than $30,000. <br />Staff requests the following approvals: <br />• Construction of a new island pavilion in a not -to- exceed amount of $535,000 <br />• Proposal to design a second pedestrian bridge in the amount of $22,000 <br />• Design of wind screen / drainage system contract addendum in the amount of $5,500 <br />• Construction of a new drainage system in a not -to exceed amount of $30,000. <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.