Laserfiche WebLink
Century Center <br />Island Park Pavilion <br />Projected Cost of Construction <br />PAVILION SIZE <br />6,400.SF 80x80 <br />CONSTRUCTION COSTS <br />A. DESIGN <br />(Under Contract $60,000) <br />Architeicture /Engineering <br />B. GEOTECHNICAL SURVEY <br />(Under Contract and Paid $6,177.25) <br />Soil Borings /Foundation Recommendtions <br />C. GENERAL CONTRACTOR <br />$14,000 <br />Gen'I Conditions, Overhead, Profit <br />D. DEMOLITION /EARTHWORK <br />$8,000 <br />E. FOUNDATIONS <br />$26,000 <br />F. CONCRETE <br />$3,000 <br />Slab, Curbs, Walls <br />G. FABRIC STRUCTURE <br />$425,000 <br />H. ELECTRICAL <br />$12,000 <br />Lighting <br />J. CONTINGENCY (9% of I.) <br />$43,920 <br />TOTAL PROJECTED CONSTRUCTION COSTS (1.+J.) <br />$531,920 <br />NOTES: <br />1. Fabric Structure projected costs include engineering, project management, steel /fab, fabric /fab, <br />installation, equipment, shipping <br />2. Recommend a not -to- exceed Total Projected Construction Cost of $535,000 <br />APPROVED <br />South Bend <br />Redevelopment Commission <br />Date: <br />