My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (4)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
07-26-11 Packet
>
6C (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:08:14 PM
Creation date
7/22/2011 2:24:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Century Center <br />Island Park Pavilion <br />Projected Cost of Construction <br />PAVILION SIZE <br />6,400.SF 80x80 <br />CONSTRUCTION COSTS <br />A. DESIGN <br />(Under Contract $60,000) <br />Architeicture /Engineering <br />B. GEOTECHNICAL SURVEY <br />(Under Contract and Paid $6,177.25) <br />Soil Borings /Foundation Recommendtions <br />C. GENERAL CONTRACTOR <br />$14,000 <br />Gen'I Conditions, Overhead, Profit <br />D. DEMOLITION /EARTHWORK <br />$8,000 <br />E. FOUNDATIONS <br />$26,000 <br />F. CONCRETE <br />$3,000 <br />Slab, Curbs, Walls <br />G. FABRIC STRUCTURE <br />$425,000 <br />H. ELECTRICAL <br />$12,000 <br />Lighting <br />J. CONTINGENCY (9% of I.) <br />$43,920 <br />TOTAL PROJECTED CONSTRUCTION COSTS (1.+J.) <br />$531,920 <br />NOTES: <br />1. Fabric Structure projected costs include engineering, project management, steel /fab, fabric /fab, <br />installation, equipment, shipping <br />2. Recommend a not -to- exceed Total Projected Construction Cost of $535,000 <br />APPROVED <br />South Bend <br />Redevelopment Commission <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.