My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.C1 Contract with Schindler Elevator
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
01-15-10 Packet
>
6.C1 Contract with Schindler Elevator
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 11:21:18 AM
Creation date
1/12/2010 4:25:03 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ ~ SOUTy 6 <br />~~ ~ 1, I ~ x'60 <br />\\~ d <br />t .5 \'e „e% <br />Community & Economic Development ~~-°--„~_~,-,~ <br />1200 County-City Building, 227 West Jefferson, South Bend, Indiana 46601-1830 Phone 574/235-9371 Fax 574/235-9021 <br />To: Redevelopment Commission <br />From: David Relos, Economic Development Planner ~~ <br />Subject: Hotel La Salle Clean Out & Elevator Safety Inspection <br />Date: January 15, 2010 <br />CLEAN OUT <br />The Hotel La Salle is currently being marketed to potential developers. In an effort to have <br />it show better, and for sanitary reasons, Staff feels it would be helpful if the Hotel were <br />cleared of all debris and furniture that have cluttered it for years. Staff has walked the Hotel <br />with three vendors, who in turn submitted proposals for the Hotel's clean out. Staff requests <br />approval for the low bidder, CBRE, whose proposal came in at $36,975 (see attached) for a <br />not to exceed amount of $40,000, in case additional work is uncovered during the clean out. <br />ELEVATOR SAFETY INSPECTION <br />To help facilitate the Hotel's clean out, but primarily for safety reasons, Staff has solicited a <br />proposal from Schindler Elevator to inspect and repair the freight elevator. The freight <br />elevator is one of three elevators in the building, and the only one that is operational (I use <br />that term loosely). Schindler was chosen because they have worked on the Hotel's <br />elevators in the past. It was noted at a site visit with Schindler that many of the elevator <br />doors on each floor are in poor condition, and that on certain floors the door arm locks could <br />stick, causing the door to be left open yet the elevator operational -meaning the door could <br />be left open to an empty elevator shaft. <br />In addition to doing each floor's elevator door maintenance, the attached proposal includes <br />the required 5 year Traction Safety Test, which among other things, tests the elevator's load <br />and braking capacity. The proposal is in the amount of $8,330 (see attached). Staff <br />requests approval for a not to exceed amount of $10,000, to allow for additional work that <br />may be uncovered during inspection and testing. <br />Thank you for your consideration. <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.