My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07142026 BPW Regular Meeting Agenda - Final
sbend
>
Public
>
Public Works
>
Agendas
>
2026
>
07142026 BPW Regular Meeting Agenda - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2026 8:32:11 AM
Creation date
7/10/2026 8:32:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Agendas
Document Date
7/10/2026
Text box
ID:
1
Creator:
Created:
7/10/2026 8:32 AM
Modified:
7/10/2026 8:32 AM
Text:
https://tinyurl.com/2025-2026BPWRegular
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND <br />BOARD OF PUBLIC WORKS <br />REGULAR MEETING AGENDA <br />JULY 14, 2026 – 9:30 a.m. <br /> <br />Virtual Meeting Link https://tinyurl.com/2025-2026BPWRegular <br />215 S. Dr. Martin Luther King Jr. Blvd., Council Chambers 3rd Floor, South Bend IN 46601 <br /> <br /> <br /> ELIZABETH A. MARADIK JOSEPH R. MOLNAR MURRAY L. MILLER BREANA N. MICOU ABIGAIL E. MAGAS Appointed 4/14/2015 Appointed 1/8/2020 Appointed 3/26/2021 Appointed 11/21/2023 Appointed 1/6/2026 <br /> <br /> Each Board of Public Works Member is appointed by the Mayor for an indefinite term <br /> <br /> Page 1 <br /> <br /> <br />1. REVIEW OF MINUTES <br />A. Approve Agenda Review, and Regular Meeting Minutes of June 18, and <br />June 23, 2026 <br /> <br />2. OPENING OF BIDS <br />A. Western Ave. Transformation District 1 - Project No. 125-047 <br />1. Funding: HUD Loan/River West TIF <br />B. Walker Field Restroom Building – Project No. 125-024 <br />1. Funding: PR-00048133 <br />C. 2026 Contractor Paving Round 3 – Project No. 126-037 <br />1. Funding: PR- 00048606 <br /> <br />3. OPENING OF QUOTATIONS <br />A. Walker Field House Restoration Project, Phase II - Masonry – Project No. <br />125-044B <br />1. Award <br />2. Funding: PR-00048174 <br />B. The Pointe at Riverwalk – Retaining Wall Materials – Project No. 124-069H <br />1. Funding: PR-00048970 <br />C. Studebaker Museum HVAC – Building Control System – Project No. 125- <br />079 <br />1. Funding: PR-00048965 <br />D. Studebaker Museum HVAC - Mechanical – Project No. 125-079 <br />1. Funding: PR-00048637 <br />E. Main Street Viaduct Beautification – Project No. 126-028 <br />1. Funding: PR-00047826 <br />F. 2026 Brick Spot Repair – Project No. 126-029 <br />1. Funding: PR-00048993 <br />G. Leighton Building 2nd Floor Slab Infill – Project No. 125-055E <br />1. Funding: PR-00048994 <br /> <br />4. AWARD QUOTATIONS AND APPROVE CONTRACTS <br />A. SBARC Signage – Project No. 126-046 <br />1. Company: Hayes Design Company <br />2. Amount: $19,641.36 <br />3. Funding: PR-00048626
The URL can be used to link to this page
Your browser does not support the video tag.