My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - BUC Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - BUC Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:28:36 PM
Creation date
9/9/2025 2:25:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />Project Name <br />Project No. <br />For Bids Due <br />The Pointe at Riverwalk Utility Materials <br />124-069 M <br />September 9th, 2025, 9:00 a.m., Local Time <br />(Must be completed for all quotes. Please type or print) <br />Date: C�.�� Firm: ^ r 0 <br />Address: <br />City/State/Zip: ,, Telephone Number: <br />Email Address:®� <br />Agent of Bidder (if Applicable): e CS' <br />Pursuant to notices given, the undersigned offers to furnish labor ar <br />public works project of: <br />the City of South Bend, Indiaria, in accordance with plarn <br />The City of South Bqnd, Department of Public Works <br />and dated 20aCi for the sum of <br />p4so�H B�''Y <br />� d . <br />PEACE " <br />x x - <br />1565 <br />L' <br />lal necessary to com <br />I <br />-Gyro (A C1- _ C'n A 1 <br />specifications prepared by: <br />thrr <br />rvhcepio,! <br />(enter the Total Quote as shownonthe Proposal) <br />z►r►x► ►,x►orv�rYa k1)LA kluu ($ 1, '-��_�,J,n ) <br />Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />By <br />(Signature) <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />The above quote is accepted this day of <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />President <br />Members <br />Version 1/3/2025 Page - 5 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.