My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - BUC Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - BUC Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:28:36 PM
Creation date
9/9/2025 2:25:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
04 SpUTH 8 <br />d <br />ti� r <br />QUOTE/PROPOSAL <br />w a <br />� PEACEj' <br />CITY OF SOUTH BEND x �_ <br />issue <br />Project Name The Pointe at Riverwalk Utility Materials <br />Project No. 124-069M <br />For Bids Due September 9th, 2025, 9:00 a.m., Local Time <br />ITEM NO <br />DESCRIPTION <br />QTY <br />UNIT <br />UNIT PRICE <br />TOTAL PRICE <br />1 <br />Stormce for STC 450i <br />EA <br />1 <br />1 /to a5o. 00 <br />$ Ito 250. 0 0 <br />2 <br />12" HDPE <br />LFT <br />340 <br />(a. /9 <br />.9 d. /py. (a.O <br />3 <br />8" HDPE <br />LFT <br />380 <br />3 • S5l <br />$ / 3,v5" ao <br />4 <br />8 X 6 WYE HDPE <br />EA <br />10 <br />19 <br />1 .?O <br />5 <br />8 X 6 REDUCER HDPE <br />EA <br />3 <br />023.5(c <br />$ '70• (AS <br />6 <br />6" HDPE <br />LFT <br />180 <br />;t.c>A <br />$ 30. <br />7 <br />6" 45 HDPE <br />EA <br />16 <br />f/ a5. <br />,� b?. Re <br />8 <br />6" 90 HDPE <br />EA <br />11 <br />Law p(a <br />9 <br />6" CLEANOUT <br />EA <br />2 <br />/`H 2 J <br />38(a . ya <br />10 <br />DOWNSPOUT <br />CONNECTION <br />EA <br />11 <br />9d ley. 3/ <br />l.9/�.y/ <br />11 <br />8" PVC SDR 35 <br />LFT <br />210 <br />9Q <br />00 <br />12 <br />8 X 6 WYE PVC <br />EA <br />11 <br />00 <br />a q, 00 <br />13 <br />6" PVC SDR 35 <br />LFT <br />364 <br />G <br />lS 3• 0 <br />14 <br />6" WYE PVC <br />EA <br />13 <br />JJ 5 .00 <br />70a. 00 <br />15 <br />6" 45 PVC <br />EA <br />33 <br />Ja 9.OC) <br />/ . 0d <br />16 <br />6" CLEANOUT <br />EA <br />13 <br />.S/. 00 <br />(,¢623.Od <br />17 <br />6" CAP PVC <br />EA <br />13 <br />&..Sp <br />a/ , 5- <br />18 <br />8" DIP CL 50 <br />LFT <br />234 <br />/ 3 , a <br />ffi g,X7. $(Q <br />19 <br />8" 45 PVC <br />EA <br />1 <br />�, 00 <br />�?, Od <br />20 <br />8" PLUG <br />EA <br />1 <br />$ 3& • Od <br />3(4, 00 <br />21 <br />8 X 6 TEE PVC <br />EA <br />1 <br />74/. DO <br />22 <br />1" K COPPER <br />LFT <br />565 <br />(p,407 <br />23 <br />1" CORP STOP AND BOX <br />EA <br />13 <br />/?$.00 <br />% Q, 3/4/.DO <br />24 <br />1" FITTINGS <br />EA <br />20 <br />,pp <br />;?00. 00 <br />5 <br />30" INLET <br />EA <br />1 <br />2IIIIIIIII&MLET <br />48" S HOLES <br />EA <br />3 <br />27 <br />EA <br />3 <br />28 <br />48" SANITARY <br />4" ADJUSTING RINGS <br />EA <br />3 <br />29 <br />30 <br />6" ADJUSTING RINGS <br />31 <br />EJIW 1022 M1 C <br />EM17AMOMASTING <br />EA <br />3 <br />32 <br />EA <br />4 <br />3 1040A CASTING <br />EA <br />3 <br />4 EJIW 1578 CASTING <br />EA <br />15 <br />CONTINUED ON NEXT PAGE <br />Version 1/3/2025 Page - 17 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.