Laserfiche WebLink
Change Order No. 13 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />1. Bid/Proposal Form: <br />Division B: <br />Subtract-327-CYS-from-Line-ltem-35:-EXCAVATION,-C-OMMON -327 CYS-@ $7..46/CYS-fora <br />total-ded uetion-of-($-2,-436,Y5r <br />Add 153 CYS to Line Item 26: BORROW, 153 CYS @ $14.00/CYS for a total addition of <br />$2,142.00 <br />Add 12 SYS to Line Item 82: SIDEWALK, CONCRETE, 4", 12 SYS @ $34.00/SYS for a total <br />addition of $480.00 <br />Subtract 12 SYS from Line Item 93: CURB RAMP, CONCRETE, H, -12 SYS @ $140.00/SYS <br />for a total deduction of ($-1,680.00) <br />Subtract 27 LIFT to Line Item 100: CURB, CONCRETE, -27 LFT @ $19.00/LFT for a total <br />deduction of (-$513.00) <br />NO CHANGE REQUIRED <br />DRAWINGS: <br />The following sheets have been revised and are issued as new sheets as a part of this Change Order: <br />Sheet 2 - Revision Note No. 11 Added <br />Sheets 49-A & 59-A - Added sheet with new profile along Main Street and Bronson <br />Street <br />Sheets 49 & 59 - Deleted Sheets <br />Sheets 66 - Revised Curb Ramp length details at SE and SW quadrants of Main and <br />Bronson Intersection. Removed Concrete Curb along the outside of proposed sidewalk <br />in the NW quadrant. <br />Sheets 91-1 & 91-2 - Revised Spot and Curb Ramp elevations <br />Sheets 198-199 & 221-1 - Relocated R3-17 & R3-17aP bike signs <br />Sheet 231 - Revised Structure Data Rim Elevations <br />Sheets 240-A, 241-A, 244-A, 245-A, 246-A - Added cross section sheets <br />Sheets 240, 241, 244-246 - Deleted Sheets <br />END OF CHANGE ORDER NO. 13 <br />Sheet 2 of 3 <br />