Laserfiche WebLink
Change Order No. 13 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: American Structurepoint, Inc. <br />Patrick K. Wooden, P.E. <br />Professional Engineer No. 10504741 <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: One -Way to Two -Way Street Conversion <br />Project No. 116-001 <br />SUBJECT: Revised Proposed Profile at Main and Bronson Intersection <br />ISSUE DATE: June 15, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a part of, <br />and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change Order: <br />1. Profile Change along Main St. (from sta. 716+26.22 to 720+00.00 Line "MAP') and Bronson <br />St. (from sta. 72+33.93 to 76+36.58 Line "BIRO"). <br />2. Spot and curb ramp elevation revisions in accordance with proposed profile change <br />3. Cross section revisions in accordance with proposed profile change <br />4. Relocated Bike Sign along Michigan St. to be north of Broadway St. <br />Sheet 1 of 3 <br />