My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.B.(2) Proposal for Phase I Environmental Assessment
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2009
>
10/2/09 Meeting
>
6.B.(2) Proposal for Phase I Environmental Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2009 8:47:18 AM
Creation date
9/30/2009 8:07:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
inch diameter, 0.01-inch (I.D.) slotted PVC screen and riser to ground surface. Once <br />installed, each temporary well would be purged utilizing a peristaltic pump, or other <br />method, until such time as the water discharge becomes relatively free of solids. PES <br />proposes that groundwater from each of the temporary wells be analyzed for similar <br />constituents identified for soil samples (BTEX, MTBE, TPH-GRO/ERO and PAHs). <br />Each groundwater sample will be appropriately labeled, packed on ice, and forwarded to <br />the laboratory (priority overnight delivery) under chain-of-custody procedures. <br />Reporting <br />Upon receipt of the laboratory analyses, data will be reviewed and tabularized. <br />Comparison of the data for each respective chemical constituent will be made to the <br />Risk Integrated System of Closure (RISC) Default Closure Values for Residential and <br />Industrial/Commercial Properties. <br />Upon completion of the initial data review, a "Letter Report" will be prepared which <br />presents the sample collection and analytical methodologies used during the field phase <br />of the assessment. Copies of the sample location maps, tabulated data and comparison <br />to RISC Default Closure Values will also be incorporated. Recommendations for any <br />additional assessment activities will be made for review and comment. <br />SCHEDULE <br />PES proposes to commence site investigation activities within one week of receipt of <br />notification to proceed (depending on weather, utility clearance and Geoprobe <br />availability). Upon mobilization, we anticipate the completion of the Ground Penetrating <br />Radar within one day, with completion of the Geoprobe sampling requiring one <br />additional day. Laboratory analyses will be completed by Pace Analytical on a one-week <br />turnaround from receipt by the laboratory. Our initial discussion of results will occur <br />within one day of receipt of laboratory analytical results. Our written Summary Letter <br />Report" will be submitted within one week of the initial conference. <br />COST ESTIMATE <br />An ESTIMATED COST for Phase II Environmental Consulting Services for the area of <br />the former gasoline service station at the SE Corner of Main St. and Western Avenue, as <br />outlined above, is presented as follows: <br />Ground Penetrating Radar Survey (maximum 3 hours on-site) <br />Field Engineering Services/Project Management <br />Equipment Rental/Field Expendables <br />Geoprobe Rental (assumes 1-day @ $1,500/day, including mobilization) <br />Laboratory Analysis: <br />5 soil samples for % Moisture @ $10/sample <br />5 soil samples for analysis of BTEX/MTBE @ $50/sample <br />5 soil samples for analysis of TPH-GRO @ $40/sample <br />5 soil samples for analysis of TPH-ERO @ $45/sample <br />5 soil samples for analysis of PAHs @ $80/sample <br />5 groundwater samples for analysis of BTEX/MTBE @ $50/sample <br />5 groundwater samples for analysis of TPH-GRO @ $40/sample* <br />5 groundwater samples for analysis of TPH-ERO @ $45/sample* <br />5 groundwater samples for analysis of PAHs @ $80/sample* <br />Terra Core Sampling Kits for collection of soil samples (25 kits @ $15/kit) <br />Reporting <br />TOTAL ESTIMATED COST <br />$ 800 <br />$1,000 <br />$ 200 <br />$1, 500 <br />$ 50 <br />$ 250 <br />$ 200 <br />$ 225 <br />$ 400 <br />$ 250 <br />$ 200 <br />$ 225 <br />$ 400 <br />$ 375 <br />1 200 <br />$7,275 <br />
The URL can be used to link to this page
Your browser does not support the video tag.