Laserfiche WebLink
1 <br />MAY 22, 2006 <br />REGULAR MEETING <br />Item <br />No. _ <br />Descri tion <br />Quanti <br />Unit Unit <br />Price <br />Total Amount <br /> <br />lw HMA Base No. SD MAC HD with <br />SBS <br />1,000 <br />TON <br />$26.00 <br />$26,000.00 <br />lx HMA.Base No. 5D Limestone or Slag 6,000' .TON $24.00 $144,000.00 <br /> <br />ly HMA Base No. SD Limestone or Slag <br />MAC 10 or MAC 20 with SBS <br />1,000 <br />TON <br />$25.00 <br />$25,000.00 <br /> <br />lz HMA Base No. Sd Limestone or Slag <br />MAC HD with SBS <br />1,000 <br />TON <br />$27.00 <br />$27,000.00 <br />laa Bituminous Patch, WS 300 TON $53.00 $15,900.00 <br /> <br />lbb Bituminous Patch, Material Special <br />AE-300P <br />600 <br />TON <br />$35.00 <br />$39,000.00 <br /> <br /> Total Amount.:of Base Bid (la <br />throuth lbbl $2,342,150.00 <br />Unit Cost Onl <br />Sasobit, 1&1/2% of the Liquid <br />U1 Bituminous Weight -Unit Cost is <br />cost added for each Ton of Material <br />Delivered $1.25 <br />BIT-MAT PRODUCTS, INC. - $209,500.00 <br />Post Office Box 428 <br />Ashley, Indiana 46705 <br />1 <br />Item <br />No. <br />Descri tion <br />Quanti <br />Unit <br />Unit Price Total <br />Amount <br />i AE-T (Bituminous Material) Tack 75,000 GAL $.95 $71,250.00 <br />2 RS-2 75,000 GAL $.98 $73,500.00 <br />3 Polymer Modified Asphalt Emulsion 65,000 GAL $ 1.48 $96,200.00 <br />4a Earthbind Dust Control ( ick-up) 50,000 GAL $.77 $38,500.00 <br />4b Earthbind Dust Control (delivered) 125,000 GAL $.87 $108,750.00 <br /> <br />5 Polymer Modif ed Asphalt Concrete <br />(MAC-lOHD & MAC-20HD) <br />125,000 <br />GAL <br />$1.78 <br />222,500.00 <br /> <br /> Total Amount of Base Bid (1 through 5) $610,700.00 <br />THE LEVY COMPANY/INDIAN TRUCKING COMPANY - $610,700.00 <br />Post Office Box 707 <br />Portage, Indiana 46368 <br />1 <br />Item <br />No. <br />.Descri tion <br />Quanti <br />Unit <br />Unit Price Total <br />Amount <br />1 Slag /Gravel -Chips 3,000 TON $14.25/Ton $42,750.00 <br />2 Sla Sand 5,000 TON- $10.15/Ton $50,750.00 <br />3 No. 24 Sand 5,000 TON $7.40 $37,000.00 <br />6 No. 53 Slag 5,000 •TON $10.90/Ton $54,500.00 <br /> <br /> Total Amount of Base Bid (1 through 6) $185,000.00 <br />Therefore, Mr. Littrell made a motion that the recommendation be accepted and the bids <br />be awarded as outlined above. Mr. Inks seconded the motion, which carried. <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, #53 Gravel and <br />#24 Sand bids were rejected, as well as approved for solicitation of quotations. <br /> <br />