,;.
<br />~ ~ ~ REGULAR MEETING
<br />MAY 22, 2006
<br />was low on two, sole on one ,and high on the fourth. The contract is recommended for
<br />award to the company with the lowest total. The question remains whether, since the
<br />Board has thrown one of the items out, the total price method can be used. Again, I.C. 5-
<br />22-17-12 requires breaking down into line items only if the solicitation makes a provision
<br />that a bid will be awarded by line. The Board has provided for an award by class, but not
<br />line. In accordance with LC. 5-22-17-12(c) we make a written determination as to why
<br />#24 Sand is being awarded with the other items in the class. Finally, there was another
<br />class of five (5) different items. There was only one bidder and it will receive the award
<br />of this class. The solicitation broke down the items in four (4) classes. The
<br />Transportation Director does not want the Board of Public Works to use its inherent '
<br />power to break down and award by lines and the Board is not obliged to do so. It is in the
<br />best interest of economy to pull out the one line item.
<br />WALSH & KELLY, INC. - $2,342,150.00
<br />24358 State Road 23
<br />South Bend, Indiana 46614
<br />Item Unit
<br />No. Descri tion Quanti Unit Price Total Amount
<br />la HMA Surface No.llLimestone 2,000 TON $35.50 $71,000.00
<br /> HMA Surface No. 11 Limestone
<br />lb MAC 10 or MAC 20 with SBS 1,000 TON $39.50 $39,500.00
<br /> HMA Surface No. 11 Limestone
<br />lc MAC HD with SB5 500 TON $41.50 $20,750.00
<br />1 d HMA Surface No. 9 Limestone 500 TON $35.50 $17,750.00
<br />le HMA Surface No. 9 Sla 500 TON $35.50 $17,750.00
<br />if HMA Surface No. 11 Slag 15,000 TON $35.70 $535,500.00
<br /> HMA Surface No. 11 Slag MAC 10
<br />1 g or MAC 20 with SBS 10,000' .TON $39.70 $397,000.00
<br /> HMA Surface No. 11 Slag MAC HD
<br />lh with SBS 5,000 TON $41.75 $208,750.00
<br /> HMA Binder No. 8 or 9 (No Local
<br />li Gravel) 2,000 TON $25.00 $50,000.00
<br /> HMA Binder No. 8 or 9 MAC 10 or
<br />lj MAC 20 with SBS 1,000 TON $26.00 $26,000.00
<br /> HMA Binder No. 8 or 9 MAC HD
<br />lk with SBS 500 TON $27.00 $13,500.00
<br /> HMA Binder No. 8 or 9 Limestone or
<br />11 Slag 2,000 TON $25.00 $50,000.00
<br /> HMA Binder No. 8 or 9 Limestone or
<br />Im Slag MAC 10 or MAC 20 with SBS 1,000 TON $26.50 $26,500.00
<br /> HMA Binder No. 8 or 9 Limestone or
<br />In Slag MAC HD with SBS 500 TON $28.50 $14,250.00
<br /> HMA Binder No. 11 (No Local
<br />to Gravel) 2,000 TON $30.00 $60,000.00
<br /> HMA Binder No. 11 MAC 10 or
<br />lp MAC 20 with SBS 1,000 TON $32.00 $32,000.00
<br /> HMA Binder No. 11 MAC HD with
<br />lq SBS 500 TON $34.00 $17,000.00
<br /> HMA Binder No. 11 Limestone or
<br />lr Slag 4,000 TON $30.00 $120,000.00
<br /> HMA Binder No. 11 Limestone or
<br />1 s Slag MAC 10 or MAC 20 with SBS 2,000 TON $34.00 $68,000.00
<br /> HMA Binder No. 11 Limestone or
<br />It Slag MAC HD with SBS 1,000 TON $36.00 $36,000.00
<br /> HMA Base No. SD (No Local
<br />lu Gravel) 10,000 TON $22.00 $220,000.00
<br /> HMA Base No. SD MAC 10 or MAC
<br />lv 20 with SBS 1,000 TON $24.00 $24,000.00
<br />1
<br />1
<br />
|