Laserfiche WebLink
REGULAR MEETING <br />MAY 8, 2006 <br />i Unit Cost Onl <br />Sasobit, 1&1/2%ofthe Liquid Bituminous <br />U1 Weight -Unit Cost is cost added for each Ton of <br />Material Delivered $1.25 <br />RIETH-RILEY CONSTRUCTION COMPANY, INC. <br />?5?00 State Road 23 <br />South Bend, Indiana 46614 <br />Bid was signed by: Mr. Gene Yarkie <br />Non-Collusion Affidavit was in order <br />Non-Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />1 <br />1 <br />Item <br />i No. <br />Description <br />Quantit <br />Unit Unit <br />Price Total <br />Amount <br />- - <br />1a --- <br />HMA Surface No. 11 Limestone <br />2,000 <br />TON <br />$48.30 <br />$96,600.00 <br /> <br />1b ~ HMA Surface No. 11 Limestone MAC 10 or MAC <br />20 with SBS <br />1,000 <br />TON <br />$48.30 <br />$48,300.00 <br /> <br />1c HMA Surface No. 11 Limestone MAC HD with <br />SBS <br />500 <br />TON <br />$50.70 <br />$25,350.00 <br />1d HMA Surface No. 9 Limestone 500 TON $44.40 $22,200.00 <br />1e HMA Surface No. 9 Sla 500 TON $46.00 $23,000.00 <br />1f HMA Surface No. 11 Sla 15,000 TON $50.30 $754,500.00 <br /> <br />1 HMA Surtace No. 11 Slag MAC 10 or MAC 20 <br />with SBS <br />10,000 <br />TON <br />$50.30 <br />$503,000.00 <br />1h HMA Surface No. 11 Sla MAC HD with SBS 5,000 TON $52.80 $264,000.00 <br />1 i HMA Binder No. 8 or 9 No Local Gravel 2,000 TON $41.80 $83,600.00 <br /> <br />j 11__ HMA Binder No. 8 or 9 MAC 10 or MAC 20 with <br />SBS <br />1,000 <br />TON <br />$41.80 <br />$41,800.00 <br />1k HMA Binder No. 8 or 9 MAC HD with SBS 500 TON $43.50 $21,750.00 <br />_ <br />11 HMA Binder No. 8 or 9 Limestone or Sla 2,000 TON $46.90 $93,800.00.00 <br />__ <br />1m HMA Binder No. 8 or 9 Limestone or Slag MAC <br />10 or MAC 20 with SBS <br />1,000 <br />TON <br />$46.90 <br />$46,900.00 <br /> <br />1n HMA Binder No. 8 or 9 Limestone or Slag MAC <br />HD with SBS <br />500 <br />TON <br />$49.00 <br />$24,500.00.00 <br />1o HMA Binder No. 11 No Local Gravel 2,000 TON $41.40 $82,800.00 <br /> <br />1 HMA Binder No. 11 MAC 10 or MAC 20 with <br />SBS <br />1,000 ' <br />TON <br />$41.40 <br />$41,400.00 <br />_ <br />1 HMA Binder No. 11 MAC HD with SBS 500 TON $43.10 $21,550.00 <br />1 r HMA Binder No. 11 Limestone or Sla 4,000 TON $43.30 $173,200.00 <br /> <br />1s HMA Binder No. 11 Limestone or Slag MAC 10 <br />or MAC 20 with SBS <br />2,000 <br />TON <br />$43.30 <br />$86,600.00 <br /> <br />1t HMA Binder No. 11 Limestone or Slag MAC HD <br />with SBS <br />1,000 <br />TON <br />$45.20 <br />$45,200.00 <br />1u HMA Base No. 5D No Local Gravel 10,000 TON $41.70 $41,000.00 <br />~ <br />1v ~ HMA Base No. 5D MAC 10 or MAC 20 with SBS 1,000 TON $41.70 $41,700.00 <br />_ <br />I <br />1w <br />HMA Base No. 5D MAC HD with SBS <br />1,000 <br />TON <br />$43.40 <br />$43400.00 <br />~ 1 x HMA Base No. 5D Limestone or Sla 6,000 TON $41.70 $250,200.00 <br /> <br />1 HMA Base No. 5D Limestone or Slag MAC 10 or <br />MAC 20 with SBS <br />1,000 <br />TON <br />$41.70 <br />$41,700.00 <br /> <br />1z HMA Base No. 5d Limestone or Slag MAC HD <br />with SBS <br />1,000 <br />TON <br />$43.40 <br />$43,400.00 <br />1aa Bituminous Patch, WS 300 TON $70.30 $21,090.00 <br />1bb Bituminous Patch, Material S ecial AE-300P 600 TON $78.70 $47,220.00 <br />