|
REGULAR MEETING
<br />MAY 8, 2006
<br />i Unit Cost Onl
<br />Sasobit, 1&1/2%ofthe Liquid Bituminous
<br />U1 Weight -Unit Cost is cost added for each Ton of
<br />Material Delivered $1.25
<br />RIETH-RILEY CONSTRUCTION COMPANY, INC.
<br />?5?00 State Road 23
<br />South Bend, Indiana 46614
<br />Bid was signed by: Mr. Gene Yarkie
<br />Non-Collusion Affidavit was in order
<br />Non-Discrimination commitment form was completed
<br />Five percent (5%) Bid Bond was submitted
<br />BID:
<br />1
<br />1
<br />Item
<br />i No.
<br />Description
<br />Quantit
<br />Unit Unit
<br />Price Total
<br />Amount
<br />- -
<br />1a ---
<br />HMA Surface No. 11 Limestone
<br />2,000
<br />TON
<br />$48.30
<br />$96,600.00
<br />
<br />1b ~ HMA Surface No. 11 Limestone MAC 10 or MAC
<br />20 with SBS
<br />1,000
<br />TON
<br />$48.30
<br />$48,300.00
<br />
<br />1c HMA Surface No. 11 Limestone MAC HD with
<br />SBS
<br />500
<br />TON
<br />$50.70
<br />$25,350.00
<br />1d HMA Surface No. 9 Limestone 500 TON $44.40 $22,200.00
<br />1e HMA Surface No. 9 Sla 500 TON $46.00 $23,000.00
<br />1f HMA Surface No. 11 Sla 15,000 TON $50.30 $754,500.00
<br />
<br />1 HMA Surtace No. 11 Slag MAC 10 or MAC 20
<br />with SBS
<br />10,000
<br />TON
<br />$50.30
<br />$503,000.00
<br />1h HMA Surface No. 11 Sla MAC HD with SBS 5,000 TON $52.80 $264,000.00
<br />1 i HMA Binder No. 8 or 9 No Local Gravel 2,000 TON $41.80 $83,600.00
<br />
<br />j 11__ HMA Binder No. 8 or 9 MAC 10 or MAC 20 with
<br />SBS
<br />1,000
<br />TON
<br />$41.80
<br />$41,800.00
<br />1k HMA Binder No. 8 or 9 MAC HD with SBS 500 TON $43.50 $21,750.00
<br />_
<br />11 HMA Binder No. 8 or 9 Limestone or Sla 2,000 TON $46.90 $93,800.00.00
<br />__
<br />1m HMA Binder No. 8 or 9 Limestone or Slag MAC
<br />10 or MAC 20 with SBS
<br />1,000
<br />TON
<br />$46.90
<br />$46,900.00
<br />
<br />1n HMA Binder No. 8 or 9 Limestone or Slag MAC
<br />HD with SBS
<br />500
<br />TON
<br />$49.00
<br />$24,500.00.00
<br />1o HMA Binder No. 11 No Local Gravel 2,000 TON $41.40 $82,800.00
<br />
<br />1 HMA Binder No. 11 MAC 10 or MAC 20 with
<br />SBS
<br />1,000 '
<br />TON
<br />$41.40
<br />$41,400.00
<br />_
<br />1 HMA Binder No. 11 MAC HD with SBS 500 TON $43.10 $21,550.00
<br />1 r HMA Binder No. 11 Limestone or Sla 4,000 TON $43.30 $173,200.00
<br />
<br />1s HMA Binder No. 11 Limestone or Slag MAC 10
<br />or MAC 20 with SBS
<br />2,000
<br />TON
<br />$43.30
<br />$86,600.00
<br />
<br />1t HMA Binder No. 11 Limestone or Slag MAC HD
<br />with SBS
<br />1,000
<br />TON
<br />$45.20
<br />$45,200.00
<br />1u HMA Base No. 5D No Local Gravel 10,000 TON $41.70 $41,000.00
<br />~
<br />1v ~ HMA Base No. 5D MAC 10 or MAC 20 with SBS 1,000 TON $41.70 $41,700.00
<br />_
<br />I
<br />1w
<br />HMA Base No. 5D MAC HD with SBS
<br />1,000
<br />TON
<br />$43.40
<br />$43400.00
<br />~ 1 x HMA Base No. 5D Limestone or Sla 6,000 TON $41.70 $250,200.00
<br />
<br />1 HMA Base No. 5D Limestone or Slag MAC 10 or
<br />MAC 20 with SBS
<br />1,000
<br />TON
<br />$41.70
<br />$41,700.00
<br />
<br />1z HMA Base No. 5d Limestone or Slag MAC HD
<br />with SBS
<br />1,000
<br />TON
<br />$43.40
<br />$43,400.00
<br />1aa Bituminous Patch, WS 300 TON $70.30 $21,090.00
<br />1bb Bituminous Patch, Material S ecial AE-300P 600 TON $78.70 $47,220.00
<br />
|