Laserfiche WebLink
n <br />~~ <br />REGULAR MEETING <br />BROOKS CONSTRUCTION COMPANY, INC. <br />635 South Beiger Street <br />Mishawaka, Indiana 46544 <br />Bid was signed by: Mr. William Stevens <br />Non-Collusion Affidavit was in order <br />Non-Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BiD: <br />MAY S, 2006 <br />Item <br />No. <br />Descri tion <br />Quantit <br />Unit Unit <br />Price Total <br />Amount <br />1a HMA Surface No. 11 Limestone 2,000 TON $37.00 $74,000.00 <br /> <br />1b HMA Surtace No. 11 Limestone MAC 10 or MAC <br />20 with SBS <br />1,000 <br />TON <br />$38.50 <br />$38,500.00 <br /> <br />1c HMA Surface No. 11 Limestone MAC HD with <br />SBS <br />500 <br />TON <br />$40.00 <br />$20,000.00 <br />1d HMA Surface No. 9 Limestone 500 TON $37.00 $18,500.00 <br />1e HMA Surface No. 9 Sla 500 TON $36.00 $18,000.00 <br />1f HMA Surface No. 11 Sla 15,000 TON $36.00 $540,000.00 <br /> <br />1 HMA Surface No. 11 Sfag MAC 10 or MAC 20 <br />with SBS <br />10,000 <br />TON <br />$37.50 <br />$375,000.00 <br />1h HMA Surface No. 11 Sla MAC HD with SBS 5,000 TON $39.00 $195,000.00 <br />1 i HMA Binder No. 8 or 9 No Local Gravel 2,000 TON $35.00 $75,000.00 <br />C <br />~ 1' HMA Binder No. 8 or 9 MAC 10 or MAC 20 with <br />SBS <br />1,000 <br />TON <br />$36.50 <br />$36,500.00 <br />1 k HMA Binder No. 8 or 9 MAC HD with SBS 500 TON $38.00 $19,000.00 <br />11 HMA Binder No. 8 or 9 Limestone or Sla 2,000 TON $34.00 $68,000.00 <br /> <br />1m HMA Binder No. 8 or 9 Limestone or Slag MAC <br />10 or MAC 20 with SBS <br />1,000 <br />TON <br />$35.50 <br />$35,500.00 <br /> <br />1n HMA Binder No. 8 or 9 Limestone or Slag MAC <br />HD with SBS <br />500 <br />TON <br />$37.00 <br />$18,500.00 <br />f <br />I 1o HMA Binder No. 11 No Local Gravel 2,000 TON $35.00 $70,000.00 <br /> <br />1 HMA Binder No. 11 MAC 10 or MAC 20 with <br />SBS <br />1,000 <br />TON <br />$36.50 <br />$36,500.00 <br />1 HMA Binder No. 11 MAC HD with SBS 500 TON $38.00 $19,000.00 <br />1 r HMA Binder No. 11 Limestone or Sla 4,000 TON $35.00 $140,000.00 <br /> <br />1s HMA Binder No. 11 Limestone or Slag MAC 10 <br />or MAC 20 with SBS <br />2,000 <br />TON <br />$36.50 <br />$73,000.00 <br /> <br />1t HMA Binder No. 11 Limestone or Slag MAC HD <br />with SBS <br />1,000 <br />TON <br />$38.00 <br />$38,000.00 <br />1u HMA Base No. 5D No Local Gravel. 10,000 TON $34.00 $340,000.00 <br />1v HMA Base No. 5D MAC 10 or MAC 20 with SBS 1,000 TON $35.50 $35,500.00 <br />1w HMA Base No. 5D MAC HD with SBS 1,000 TON $37.00 $37,000.00 <br />1x HMA Base No. 5D Limestone or Sla 6,000 TON $34.00 $204,000.00 <br /> <br />1 HMA Base No. 5D Limestone or Slag MAC 10 or <br />MAC 20 with SBS <br />1,000 <br />TON <br />$35.50 <br />$35,500.00 <br /> <br />1z HMA Base No. 5d Limestone or Slag MAC HD <br />with SBS <br />1,000 <br />TON <br />$37.00 <br />$37,500.00 <br />1 <br />1 <br />1 <br />