My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(1) Blackthorn Golf Course Telephone System
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2009
>
09/04/09 Meeting
>
6B(1) Blackthorn Golf Course Telephone System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2009 9:35:48 AM
Creation date
9/1/2009 4:03:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Customer Responsibilities <br />A. Environmental Requirements <br />1. The telephone room must be clean, dry and well ventilated. <br />2. The recommended temperature range must be maintained between 59 degrees and 86 degrees <br />Fahrenheit(with the maximum range between 32 degrees to 122 degrees Fahrenheit). <br />3. The humidity must be between 0 to 95% non-condensing. <br />4. The equipment must be located at least 4 meters (13.1 feet) from equipment such as copiers, electric motors, <br />and other equipment that can produce electromagnetic, radio <br />B. Equipment Requirements for A.C. Power <br />1. One dedicated 120 volt AC normal, 50/60 hz, 15, amperes service with a third wire isolated ground. The <br />NEMA number for the 120 volt receptacle is IG5-15R. <br />2. Equipment outlet should be non-switched and located no more than 1.5 meters (4.9 feet) from the Key Service <br />Unit. <br />C. Equipment Room Layout <br />1. Backboard large enough to accommodate system modules and distribution blocks will be required. Normally a <br />4' x 8' x 3/4' plywood backboard capable of supporting 50 lbs. will meet these requirements. <br />Blackthorn Golf Club shall have the installation site, including the switch room prepared and ready in accordance <br />to the manufacturer's specifications and available for AT&T to begin installation. <br />Blackthorn Golf Club shall complete all requirements for raceways, boring and cuttings, trenching, conducts, <br />variances and rights of way required for the installation of the system. <br />Blackthorn Golf Club assumes responsibility for all equipment at delivery and shall provide a secure and <br />adequately sized storage area for said equipment. <br />Assign a Project Acceptor for the project; a key individual in the organization possessing the responsibility for final <br />acceptance of all deliverables. <br />The Project Acceptor is also the single point of contact at Blackthorn Golf Club for processing and submitting all <br />change requests. <br />Blackthorn Golf Club will provide AT&T and their sub contractors access to their premises as required. <br />Blackthorn Golf Club will provide access to equipment room and electrical outlets necessary to power the system <br />hardware. <br />CUSTOMER SIGNATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.