My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(1) Blackthorn Golf Course Telephone System
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2009
>
09/04/09 Meeting
>
6B(1) Blackthorn Golf Course Telephone System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2009 9:35:48 AM
Creation date
9/1/2009 4:03:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AT&T <br />STATEMENT OF WORK <br />Blackthorn Golf Club <br />Environmentals <br />AT&T and Blackthorn Golf Club have agreed that a safe and healthy work environment will be provided to our <br />respective employees and that each will comply with all local, state and federal laws and regulations governing <br />job safety. <br />It is the customer's responsibility to make known and correct any environmental or safety hazards that may be <br />encountered during the work operations, including but not limited to the presence of friable asbestos. <br />AT&T Responsibilities (General) <br />AT&T will be responsible for the following: <br />Serve as the central point of contact for all AT&T project related issues (e.g. client relationship issues, training <br />coordination, change orders, project acceptance documents and project related correspondence). <br />Conduct a site evaluation of the proposed equipment room prior to equipment shipment. <br />AT&T Responsibilities (Specific) <br />AT&T shall also provide the following services for Blackthorn Golf Club: <br />1. Install one (1) BCM50 with (6) T7316e Telephone Set W/MWI -Charcoal <br />2. Install (4) Test Central Office and/or Centrex Lines and (6) Tone, Tag and Test Customer's Present Cable <br />At equipment room, terminate on an AT&T connection block(s). Provide labels and label <br />connection block with jack number. At end-user location, terminate on RJ11-C flush mount or <br />surface mount jacks where applicable. Label jacks on the inside with the jack number. <br />Provide troughs at the top of each row. All new cable assumes a maximum 150 <br />foot distance. Additional footage requirements will be billed on a time and material basis. <br />All customer provided wiring must meet system specifications and must consist of <br />one twisted or spiraled pair per phone; <br />RJ11-C flush mount or surface mount jack at end-user location: <br />a loop resistance of less than 59 ohms; a cable length of less than 1,000 ft. (24AWG) and <br />contain no bridge taps. Wiring that does not conform to these parameters must be <br />replaced at the customer's expense. An optional Norstar Auxiliary Power Supply <br />may be purchased to extend the length of the loop from 1,000 ft. Up to 2600 ft. <br />3. Provide a log book outlining station numbers, jacks and locations for each end user where AT&T is installing <br />new cable. Include RJ21X(s), trunk numbers and pin positions. If AT&T is reusing customer-provided wiring, the <br />customer must provide a log book outlining station numbers, jacks and locations for each end-user. <br />4. Program KSU, test stations, and trunks <br />All work will be performed during normal business hours 8:00 AM to 5:00 PM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.