My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2383 contracting the boundaries of the West Washington-Chapin Development Area
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2383 contracting the boundaries of the West Washington-Chapin Development Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 9:26:39 AM
Creation date
7/28/2009 9:26:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Industrial Area Development Plan <br />New development as part of the Washington Street project will provide job opportunities during <br />construction. However, the major source of employment is the underutilized industrial area located <br />south of Washington Street. Preliminary estimates indicate that development of an industrial park in <br />this area could accommodate approximately 130,000 square feet of new industrial space. If this area <br />could be successfully marketed over a ten year period utilizing both Enterprise Zone and Tax <br />Increment Financing incentives, an average of 13,000 square feet of new space per year may provide <br />job opportunities for 8 to 12 persons, depending on the type of industrial use. (See Figure 6, Industrial <br />Area Development Plan) <br />REVITALIZATION STRATEGY AND IMPLEMENTATION PROGRAM <br />The Near Westside Concept Plan establishes a basic framework for the future growth and <br />revitalization of the area. Key to the success of this revitalization effort, however, is the basic <br />strategy or "game plan" for using limited resources to achieve the highest level of impact. <br />It is unrealistic to assume that the revitalization of the Near Westside area can take place <br />overnight. Thus, it is essential that the timing and sequence of project activities and the use of <br />resources be orchestrated in a manner that will achieve the Near Westside area's revitalization <br />objectives. <br />A major goal of the revitalization strategy is to create an environment for reinvestment in the <br />study area, with rehabilitation, renovation and new construction. These are the investments that <br />create positive and lasting values. This can be achieved if the strategy builds upon the existing <br />assets or strengths of the area, including its proximity to downtown, the historic district, its <br />institutions and organizations, its strong sense of history and community, and its good <br />transportation linkages. <br />The strategy must also focus on removing obstacles to reinvestment. This means overcoming <br />negative influences, such as blight, obsolescence and dilapidation. Finally, the limited resources <br />must be used to obtain the greatest return. Leveraging public and/or private investments to <br />achieve a "multiplier" effect should be pursued wherever possible. <br />The revitalization strategy should have the support of all who will contribute to, benefit from, or <br />have a stake in the successful revitalization of this neighborhood. It must be an agreed-upon <br />strategy that brings the public and private sectors together into a partnership venture. This <br />provides the basis for a coordinated management of complementary public and private actions to <br />revitalize the Near Westside area. <br />The recommended strategy is comprised of a number of interdependent and complementary <br />components. Principal among these are the strategies for new neighborhood-scale residential and <br />commercial development, continued housing rehabilitation, and the stimulation of new, in-fill <br />one- and two-family dwellings. These and other supporting elements are described later in this <br />chapter. <br /> <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.