Laserfiche WebLink
REGULAR MEETING JULY 13, 2009 230 <br />Flow Model <br />... ........ <br />Agreement <br />Lawson-Fisher <br />East Bank- Improvement <br />$145,000.00 <br />Mr. Inks/Mr. <br />Associates <br />Area Sewer Study <br />(2007B Sewer <br />Murphy <br />(Project No. 109-048) <br />Bond) <br />Professional <br />Limno-Tech, <br />Water Quality <br />NTE $ 10,000.00 <br />Mr. Inks/Mr. <br />Services <br />Inc. <br />Engineering Services <br />(Sewage Works <br />Murphy <br />Agreement <br />for CSO LTCP <br />Engineering) <br />Educational <br />Brown Mackie <br />Provide Practical and <br />N/A <br />Mr. Inks/Mr. <br />1 Affiliation <br />College <br />Technical Learning <br />Murphy <br />Agreement <br />Experience in the <br />Veterinary Tech field <br />Bid Price <br />Midwest <br />Vendor has extended <br />$411,400.00 <br />Mr. Inks/Mr. <br />Extension <br />Meters <br />unit pricing from <br />(Water Capital) <br />Murphy <br />Agreement <br />9/30/09 to 12/31/09 <br />Proposal <br />Great Lakes <br />Century Center Island <br />$1,647.50 <br />Mr. Inks/Mr. <br />Subsurface, <br />Renovations <br />(Engineering <br />Murphy <br />LLC <br />Operations) <br />Lease <br />Main Street <br />Five Year Lease <br />$4,303.60 per <br />Tabled — Mr. <br />Agreement <br />Row <br />Renewal for Water <br />month <br />Gilot/Mr. <br />Properties, <br />Works Department <br />(Water Works <br />Inks <br />LLC <br />Offices <br />Operations) <br />Agreement <br />Greeley & <br />Continuing negotiations <br />$73,109.67 <br />Mr. Inks/Mr. <br />Amendment <br />Hansen, LLC <br />with EPA and <br />(WWTP <br />Murphy <br />No. 5 <br />Development of Final <br />Engineering) <br />LTCP <br />Agreement <br />Architecture <br />Architecture Plans for <br />$58,700.00 <br />Mr. Inks/Mr. <br />Design Group <br />the Renovation of <br />(Bond) <br />Murphy <br />Century Center <br />Convention Hall C <br />Addendum to <br />Redevelopment <br />Amend Master Agency <br />$300,000.00 <br />Mr. Inks/Mr. <br />Master Agency <br />Commission <br />Agreement to include <br />Murphy <br />Agreement <br />the Mayflower Road <br />Trunk Sanitary Sewer <br />Professional <br />Abonmarche <br />Design for Mayflower <br />$293,630.00 <br />Mr. Inks/Mr. <br />Services <br />Consultants, <br />Road Trunk, Sanitary <br />(AEDA/TIF) <br />Murphy <br />Agreement <br />Agree <br />LLC <br />Sewer <br />New Energy <br />Entry Upon Public <br />N/A <br />Mr. Inks/Mr. <br />Agreement <br />Corp. <br />Property for <br />Murphy <br />Construction and <br />Sampling <br />Agreement <br />Land, eeney <br />Re-subdivision of <br />$5,500.00 <br />Mr. Inks/Mr. <br />& Associates <br />Riverside Drive <br />(Engineering <br />Murphy <br />Properties for Riverside <br />Operations/Other <br />Trail <br />Professional <br />Services) <br />Contract <br />The Troyer <br />Federal Stimulus <br />NTE $15,000.00 <br />Mr. Inks/Mr. <br />Addendum <br />Group <br />Funding Assistance <br />(Engineering <br />Murphy <br />Operations & <br />Management) <br />Construction <br />L.L. Geans <br />Jon R. Hunt Plaza <br />$7,985.00 <br />Mr. Inks/Mr. <br />Contract <br />Construction <br />Improvements — <br />(Central <br />Murphy <br />Co. <br />Decorative Concrete <br />Development <br />Area TIF) <br />Proposal <br />Greeley & <br />Pump No. 3 Drive <br />NTE $25,000.00 <br />Mr. Inks/Mr. <br />Hansen <br />Replacement <br />(WWTP <br />Murphy <br />Engineering <br />Other <br />Contractual) <br />Contract <br />Community <br />Child Care Subsidy <br />$33,401.00 <br />Mr. Gilot/Mr. <br />Coordinated <br />Program <br />(CDBG) <br />Inks <br />L <br />Child Care <br />