Laserfiche WebLink
Hall of Fame <br />College Football <br />. <br />Capital-Cost 2009 <br /> <br />Replace 2 compressors, motors, rotors, and screws on the Trane cooling system 45,000.00 <br /> <br />Replace cracked coil on the air handler that services the main level 8,000.00 <br /> <br />Replace mixing valve, valve, and thermostat on tempered water line 1,500.00 <br /> <br />Adjust and rebalance air handler system and pneumatic controls 1,500.00 <br /> <br />Replace 7 exterior outlets and 3 electric panel breakers 1,500.00 <br /> <br />New lock cores for lower level security doors 500.00 <br /> <br />Rep ace set o 2 ire oors eading to tunnel, a dust ower eve ,Wort east stair oor to <br />close and latch smoothly, replace all weather stripping around 6 sets of entry doors <br /> <br />7,500.00 <br /> <br />Replace 2- 1/3 hp pumps.and 2 -1/2 HP motors 2,000.00 <br /> <br />Replace 15 exterior light fixture where seals and/or ballast have failed 5,000.00 <br /> <br />Replace one 6' x 6" pane of glass on the west side of building 1,500.00 <br /> <br />Cost to separate fire alarm system from Century Center 500.00 <br /> <br /> Total 74,500.00 <br /> <br />Prepared b Mark Maurer <br />