Laserfiche WebLink
alternative at the Band Parties' sole discretion, complete the loop <br />that is located off the Site; and <br />(B) To bore and jack to install 'a 12" diameter waterline Extension from <br />the Site boundary south. under US -31. <br />(2). Sewer Extension. The Band Parties agree to abandon the existing lift <br />station and forcemain located on the Site and extend, at the Band Parties' <br />cost, the trunkline sewer from the lift station located on the Site north <br />under Prairie Avenue to the Calvert Street Lift Station. <br />5. Band Parties Obligations. The Band Parties shall fulfill the following obligations <br />regarding water system and sewer system services and improvements; <br />(a). At the Band Parties' cost, design,, apply for City and State permits required by <br />law, and construct the Extension for the Initial Phase improvements to the <br />water system and sewer system located on the Site. <br />(b). Provide all design plans for the Initial Phase improvements and the Full <br />Build -Out Phase improvements to the City. The design plans will be prepared <br />at the Band Parties' expense by an engineering firm that meets all Indiana <br />professional registration and licensing requirements. The design plans will be <br />performed in accordance with the City's standards and specifications and <br />must be submitted and approved by the City, the applicable regulatory <br />agencies, and other governmental bodies prior to construction. <br />(c). In order to allow the system improvements located on Site to serve adjacent <br />property owners in the future, the Band Parties shall, upon completion of the <br />Initial Phase, convey an easement, not less than thirty (30) feet, and dedicate <br />to the City within such easement all water system and sewer system <br />improvements located on the Site, including the gravity sewer, forcemain, and <br />lift station. Upon completion of the Full Build -Out Phase, the Band Parties <br />shall also convey an easement and dedicate to the City within such easement <br />all water system and sewer system improvements related to the Full Build -out <br />Phase located on the Site provided, however, that at the Band Parties' <br />discretion and to the extent feasible the Band Parties may, upon the written <br />consent of the City, convey such easement to the City prior to the date of <br />completion of the Full Build -Out Phase improvements. Prior to dedicating the <br />Initial Phase and Full Build -Out Phase improvements to the City, the Band <br />Parties shall be responsible for all maintenance and repairs to the <br />improvements and shall be responsible for all costs related to such <br />maintenance and repairs. Accordingly, the Band Parties must present the City <br />Page 6 of 16 <br />