My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
An agreement with the Pokagon Band of Potawatomi Indians
sbend
>
Public
>
Common Council
>
Legislation
>
Resolutions/Special Resolutions
>
2016
>
An agreement with the Pokagon Band of Potawatomi Indians
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 4:35:30 PM
Creation date
4/14/2016 12:45:27 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Resolutions
City Counci - Date
4/11/2016
Ord-Res Number
4554-16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(A) Extend a 12" water main and services, including valves, hydrants, <br />and fittings, from the existing main on Locust Road through the <br />residential development on the Site to the hydrants and utility <br />building located on the Site with tees and valves to extend and loop <br />the water main offsite under US -31 and to Prairie Avenue to <br />accommodate future off -site need; <br />(B) Design and construct the system to City, State, and any other <br />applicable regulatory standards, including hydrants, and valves; and <br />(C) Include individual meters for all potable uses on the Site, including <br />each residential unit, and for all 'irrigation uses, whether such potable <br />and irrigation uses currently exist on the Site or will be developed in <br />the future.. <br />(2). Sewer Extension. <br />(A) Install gravity sewers from existing and proposed development on <br />the Site to a central lift station to be located on the Site near the <br />detention basin, which lift station will discharge wastewater through <br />a forcemain to the existing sewer on Locust Road and shall have a <br />back -up power supply; <br />(B) Install a section of 24" trunkline sewer from the truck dock area of <br />the proposed casino development to the lift station on the Site, which <br />will serve as a future trunkline; and <br />(C) Construct the system in accordance with City, IDEM, and any other <br />applicable regulatory standards, including a backup power supply <br />and bypass pump connections. <br />(b). Full Build -Out Phase. <br />(1). Water Extension. In the interest of increasing the reliability of the water <br />system and depending on the needs for water in the area of the Site when <br />the Full Build -Out Threshold is met or at another earlier time if mutually <br />agreeable to the Band Parties and the City, the parties, pursuant to the <br />terms herein agree as follows: <br />(A) To loop the watermain located on the Site around the Resort to <br />connect to the low- pressure system at Prairie Avenue or, in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.